My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2245
>
2900 - Site Mitigation Program
>
PR0518127
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 11:50:34 AM
Creation date
5/17/2019 11:27:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0518127
PE
2950
FACILITY_ID
FA0013712
FACILITY_NAME
RAYMOND INVESTMENT CORPORATION
STREET_NUMBER
2245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16336017
CURRENT_STATUS
01
SITE_LOCATION
2245 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOMATRIX <br /> Soil borings will be advanced using the methods described in the "Drilling and Destruction of <br /> Soil Borings" (Appendix Q. <br /> ' Soil samples will be collected using the methods described in the "Soil Sampling for Chemical <br /> Analysis" (Appendix Q. <br /> ' Soil samples will be transported under chain of custody procedures and will be analyzed by a <br /> California certified laboratory for nitrate, TKN, and AN using the following methods: <br /> • Nitrate as N, EPA 300; <br /> ' • Ammonia as AN, EPA 351.2; <br /> ' • TKN, EPA 350.3M. <br /> ' All soil samples will be extracted for the above nitrogen analysis. Initially, only the two <br /> shallowest soil samples from each boring within the "foot prints" of the former tank farms will <br /> be analyzed. If additional analysis of deeper soil samples are needed to evaluate the depth of <br /> elevated nitrogen concentrations (greater than background) (Bradford, et al, 1996) in a <br /> particular boring, Geomatrix will request that the laboratory analyze the deeper sample extracts <br /> from that boring. <br /> ' 5.3 SITE ASSESSMENT REPORT <br /> After the soil assessment has been completed and the laboratory analytical results have been <br /> ' received for the soil samples, Geomatrix will prepare a site assessment report. The report will <br /> summarize the field and laboratory methods used and the results of field and laboratory <br /> measurements. The report will include a map showing sample locations and laboratory <br /> analytical results. The report will evaluate the characterization results for the lateral and <br /> vertical extent of elevated nitrogen concentrations in the soil below the HCC facility. It may <br /> recommend additional assessment of soil, depending upon the assessment results. <br /> 6.0 PRELIMINARY SCHEDULE <br /> The soil assessment described above can be initiated upon receiving the EHD's approval of this <br /> work plan and obtaining the necessary site assessment permits from San Joaquin County. Field <br /> assessment activities can be initiated with 2 to 3 weeks of receiving the EHD's approval and <br /> will require approximately 1 day of drilling activity. Laboratory analytical results should be <br /> ' \\ff2\deptdate\PROJECnC5193\5193.001\5193.001-SAWP.dm 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.