My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
16
>
2900 - Site Mitigation Program
>
PR0522479
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 2:14:40 PM
Creation date
5/17/2019 2:01:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0522479
PE
2957
FACILITY_ID
FA0015299
FACILITY_NAME
GEWEKE LAND DEVELOPMENT & MARKETING
STREET_NUMBER
16
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04323013
CURRENT_STATUS
01
SITE_LOCATION
16 S CHEROKEE LN
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED MONITORING AND REPORTING PROGRAM NO. 94-701 - 2 - <br /> GEWEKE LAND DEVELOPMENT AND MARKETING • <br /> SAN JOAQUIN COUNTY <br /> After several rounds of monitoring have been reviewed, the sampling schedule may be <br /> modified, at the discretion of the Board. <br /> All constituents and peaks in ground water samples are to be reported. <br /> Board.these analyses may �e deieteei ftafn the fneftitering program, at the 4.seretioft of the <br /> SOIL GAS/VAPOR MONITORING D <br /> The existing soil gas/vapor monitoring network consists of the ground water monitoring network <br /> listed above and seven vapor wells, VW1 through VW7. After construction, all new wells and <br /> monitoring points will be included in the monitoring program. Cone penetrometer technology <br /> may be used to replace permanent gas/vapor wells where applicable. Gases and vapors shall be <br /> monitored as follows: <br /> Table 3., Soil Gas/Vapor Monitoring <br /> Startup' Regular** <br /> Bioremediation Type of Sampling Sampling Sample Analytical <br /> Parameters Units Sample Frequency Freauencv Location Method <br /> Bararnetrie Pressure fnmilg Weekly T-wieehlanthiy All inaettlated wells Field Mete! <br /> Oxygen Gas (OJ % In-situ Weekly Twice Monthly All inoculated wells Field Meter <br /> Monthly Quarterly Uninoculated wells <br /> Carbon Dioxide (CO.) % In-situ Weekly Twice Monthly All inoculated wells Field Meter <br /> Monthly Quarterly Uninoculated wells <br /> Methane (CH,) % in-situ Quarterly Quarterly MW3, MW4, MW14 Field Meter <br /> Nitrogen Gas (No % In-situ Quarterly Quarterly MW3, MW4, MW14 Field Meter <br /> Hydrocarbon Vapors mg/cm' In-situ Weekly Twice Monthly All inoculated wells Field Meter <br /> Monthly Quarterly Uninoculated wells <br /> * Startup monitoring consists of six months following full scale inoculation. <br /> ** Regular monitoring begins immediately following the end of the six month startup period. <br /> After several rounds of monitoring have been reviewed, the sampling schedule may be <br /> modified, at the discretion of the Board. <br /> SOIL SAMPLING <br /> Quarterly, one soil boring will be drilled near MW8, MWI1, and EWI and three soil borings will <br /> be drilled in the concentrated inoculated area, which may also be described as the area • <br /> bounded by the air blower system (See attached Figure 1). A minimum of six borings will be <br /> Frilled each quarter. <br /> soil.for the purpose ef biarente4iating The initial round of borings will be approximately three <br />
The URL can be used to link to this page
Your browser does not support the video tag.