Laserfiche WebLink
REVISED MONITORING AND REPORTING PROGRAM NO. 94-701 3 _ <br /> GEWEKE LAND DEVELOPMENT AND [MARKETING <br /> SAN JOAQUIN COUNTY <br /> feet from the inoculation points. Upon evidence of activity of the inoculated bacteria, the <br /> following round of soil borings will be drilled an additional three feet from the previous round of <br /> borings. <br /> Borings will be drilled with a hollow-stem auger drill rig. Drilling will consist of continuous <br /> coring with continuous detailed logs of the geological strata. Coring will extend to the surface of <br /> the water table. Soil samples will be collected for analysis beginning at the upper edge of the <br /> contaminated zone, at all changes in lithology, at the top of the capillary fringe, and just above <br /> the surface of the water table. With adequate justification, selected samples, rather than all, <br /> may be submitted to the laboratory for analyses. <br /> ID <br /> Cone penetrometer technology may be used to replace soil borings where applicable. <br /> The Board shall be notified five days in advance of any drilling. <br /> Table 4: Sampling for Biological Activity in Soil <br /> Type of Sampling Sam le <br /> • Constit nts Units Sample Freauencv LocationMethod <br /> cal <br /> Purgeable Aromatic Organics mg/kg Driven Tube Quarterly Described Above 8020 - <br /> TPH as Gasoline mg/kg Driven Tube Quarterly Described Above GCFID <br /> Bacterial Composition Genera Driven Tube Quarterly Described Above Various Methods <br /> Bacterial Numbers cells/mg Driven Tube Quarterly Described Above Various Methods <br /> Nitrate mg/kg Driven Tube Quarterly Described Above TCLP/EPA 300 <br /> Nitrite mg/kg Driven Tube Quarterly Described Above TCLP/EPA 300 <br /> Phosphate mg/kg Driven Tube Quarterly Described Above TCLP/EPA 300 <br /> PH ---- Driven Tube Quarterly Described Above <br /> After several rounds of monitoring have been reviewed, the sampling schedule may be <br /> modified, at the discretion of the Board. <br /> REPORTING <br /> Existing monitoring locations are shown in Figure 1. Prior to construction, plans and <br /> specifications for soil borings, ground water monitoring, injection, and extraction wells, and <br /> air/vapor monitoring, injection, and extraction wells/points shall be submitted to Board staff for <br /> review and approval. <br /> The Board shall be notified prior to implementation of the following events: <br /> • <br /> I. Addition of water to the subsurface; <br />