My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
16
>
2900 - Site Mitigation Program
>
PR0522479
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 2:14:40 PM
Creation date
5/17/2019 2:01:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0522479
PE
2957
FACILITY_ID
FA0015299
FACILITY_NAME
GEWEKE LAND DEVELOPMENT & MARKETING
STREET_NUMBER
16
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04323013
CURRENT_STATUS
01
SITE_LOCATION
16 S CHEROKEE LN
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jeff Warner - 2 - 20 November 1989 <br /> Because there are high levels of hydrocarbon contaminants in the monitoring <br /> well located near the dispenser island, and low levels of contamination in the <br /> wells located upgradient from the dispenser island, we must conclude that the <br /> high levels of ground water contamination identified on the Geweke property <br /> originated from discharges at this site. <br /> Although there are other sites in the area which may have contributed to the <br /> contamination, Geweke, as the owner, is responsible to investigate and cleanup <br /> the ground water contamination resulting from discharges at the Geweke site. <br /> We request that Geweke conduct an investigation to determine the full extent <br /> Gr contamination resulting from the discharge of hydrocarbons at this site, <br /> and that Geweke take appropriate remedial action. <br /> Pursuant to California Water Code, Section 13267, we require that Geweke <br /> submit a work plan by 11 December 1989, for completing a Problem Assessment <br /> Report (PAR) , and that Geweke submit the PAR by 30 January 1990. The work <br /> plan should include, but not be limited to, installation of monitoring wells <br /> designed to define the full extent of ground water contamination emanating <br /> from this site. Enclosed for your use is a copy of our reporting requirements <br /> for the PAR. <br /> Failure to provide the requested information by the above dates may initiate <br /> formal enforcement action requiring investigation and cleanup and abatement. <br /> If you have any questions, please call Tom Peltier of our Underground Tank <br /> Unit at (916) 361-5731. <br /> THOMAS R. PINKOS <br /> Supervising Engineer <br /> TDP/tdp <br /> Enclosure: <br /> cc: Mr. Keith Howard, Tinning & DeLap, Walnut Creek <br /> ✓Ms. Laurie Cotulla, San Joaquin County Department of Public Health <br /> Services, Stockton <br /> Mr. Randy Yackzan, Brown & Caldwell , Sacramento <br />
The URL can be used to link to this page
Your browser does not support the video tag.