Laserfiche WebLink
log borings <br /> Support zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used ,is <br /> follows: <br /> Level D hard hat <br /> steel-toed boots <br /> half faced resp. (if_ necc <br /> gloves <br /> If air purifying respirators are authorized, organic vapor and dust <br /> is the appropriate canister for use with the involved substances <br /> and concentrations. <br /> No changes of the specified levels of protection shall be made <br /> without the approval of the site safety officer and the project <br /> team leader. <br /> F. ONSITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the <br /> following tasks: <br /> Project <br /> Team Leader : Robert Marty/ log borings, <br /> Kevin McKibben _preserve samples,_ <br /> supervise well completion <br /> Work Party #1 Drilling crew _ drill borings. <br /> Drilling crew obtain samples <br /> Drilling crew _ install monitoring wells <br /> The works party(ies) were briefed on the content of this pian at <br /> the site on <br /> G. COMMUNICATION PROCEDURES <br /> If hearing is impaired, the following standard hand signals will be <br /> used: <br /> Hand gripping throat. . . . . . . . . . . . . . .out of air, can't breathe <br /> Grip partner's wrist or <br /> both hands around waist. . . . . . .Leave area immediately <br /> Hands on top' of head. . . . . . . . . . . . . . .Need assistance <br /> Thumbs up. . . . . . . . . . . . . . . . . . . . . . . . . .OK, I am alright, <br />