Laserfiche WebLink
Chronology - 6 - 17 February 1993 <br /> Geweke . <br /> 28 Jan 92 A quarterly report addendum was submitted by Sun Tech. <br /> 17 Mar 92 In a telephone conversation between County and Board staffs, <br /> the FRP was discussed. They proposed to use MW4 as an <br /> extraction well , however, MW4 has gone dry during the summer. <br /> They did not propose additional aquifer testing but they were <br /> previously told it would be necessary if they intended to <br /> reinject treated ground water. <br /> 31 Mar 92 In a letter to County staff, Board staff reported that the FRP <br /> was incomplete and an addendum should be submitted by 30 April <br /> 1992. The FRP lacked maps showing the extent of soil <br /> contamination, a discussion of the soil vapor extraction <br /> system, a proposal to use an extraction well that contains <br /> water year round, the location of the reinjection well , and <br /> the results of additional aquifer tests. Failure to comply <br /> may result in fines. <br /> 14 Apr 92 Quarterly report submitted by Sun Tech. It did not contain <br /> results for all constituents listed in the MRP. <br /> 16 Apr 92 In a letter to Geweke, the Office of Chief Counsel advised <br /> that the petition to rescind the C&A had been dismissed: <br /> 29 May 92 In a letter to Geweke, County staff repeated Board staff <br /> comments and required that the missing information be <br /> submitted by 30 June 1992. <br /> 19 Jun 92 Letter from Geweke to County was submitted to County but not <br /> to the Board. <br /> 30 Jul 92 In a letter to County staff, Geweke's consultant, GAS, <br /> responded to the County letter. Several of the responses are <br /> inadequate. They await County approval before they proceed <br /> with the definition of soil contamination and submittal of a <br /> Report of Waste Discharge. <br /> 20 Jul 92 Quarterly report submitted by Sun Tech did not contain all <br /> required analyses. <br /> 15 Oct 92 Quarterly report submitted by Sun Tech did not contain all <br /> required analyses. <br /> 1 <br /> 19 Jan 93 Quarterly report submitted by Sun Tech did not contain all <br /> required analyses. <br />• 22 Jan 93 Letter from Board staff to Geweke stating that they are not in <br /> compliance with C&A, the FRP was incomplete, and requesting <br /> contact by 3 February 1993 to set up meeting. <br /> . I <br /> i <br />