' Final Remedial Plan - Geweke <br /> 2 January 1992 <br /> Page 9 of 15 <br /> 3 . 7 . DETAILED WORK PLAN <br /> 3 .7 . 1. LIMITED SOIL-GAS SURVEY <br /> 1) Develop a project--comprehensive health and safety plan (HSP) <br /> for the site in accordance with the. Occupational Safety and <br />' Health Guidance Manual for Hazardous Waste Site Activities. <br /> 2) Notify the SJEHD 72 hours prior to initiating any work. <br />' 3) Prior to initiation of work, brief all involved personnel with <br /> the contents of the HSP. <br />' 4) Drive in soil-gas probes at 24 locations in 5-foot grid <br /> (Figure 3) to a depth of approximately 10 feet below ground <br /> surface. Depending on the results the actual number and <br /> locations of the probes might be different than depicted. <br /> 5) Evacuate the standing vapor in the probes using an oil-less <br /> vacuum pump for approximately five minutes. <br /> 6) Take the organic vapor (OV) reading using a PID and log the <br /> concentrations. <br /> 7) Plot and contour the OV concentrations. Determine the maximum <br /> hot spot and drill the first pilot boring for the extraction <br />' well in that area. <br /> 8) Notify the SJEHD about the findings. <br /> 1 <br /> 3 . 7 . 2 . ADDITIONAL ASSESSMENT OF VADOSE ZONE CONTAMINATION AND <br /> INSTALLATION OF EXTRACTION WELLS <br /> 1) Obtain a permit to install four (4) extraction wells from the <br /> SJEHD. <br /> 2) Notify the SJEHD 72 hours prior to initiating any work. <br />' 3) Prior to initiation of work, brief all involved personnel with <br /> the contents of the HSP. <br /> 4) Drill four (4) pilot borings east of the existing monitoring <br /> well MW--4, using truck-mounted hollow stem augers to a depth <br /> of 70 feet each (Figure 4 -- Site Plan) . The location of the <br /> wells is determined by the results of the soil-gas survey (see <br />' Section 3 . 7. 1) . The proposed arrangement of the pilot borings <br /> is depicted on Figure 4 . <br /> 1 <br />