My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001714
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
16
>
2900 - Site Mitigation Program
>
PR0522479
>
ARCHIVED REPORTS XR0001714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 2:59:30 PM
Creation date
5/17/2019 2:36:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001714
RECORD_ID
PR0522479
PE
2957
FACILITY_ID
FA0015299
FACILITY_NAME
GEWEKE LAND DEVELOPMENT & MARKETING
STREET_NUMBER
16
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04323013
CURRENT_STATUS
01
SITE_LOCATION
16 S CHEROKEE LN
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 December 2003 <br /> AGE-NC Project No 95-0109 <br /> Page 2 of 6 <br /> full-scale inoculation with hydrocarbon-consuming bacteria Details of well inoculation can be found <br /> in the GeoAudit-prepared Quarterly Report- September 1994, dated 18 October 1994 <br /> In May and September 1998 and January 1999 hydrogen peroxide was added to selected wells to <br /> increase dissolved oxygen concentrations and promote biodegradation The most recent soil borings <br /> were advanced in February 1999,to assess the progress of the in-situ bioremediation Results of the <br /> investigation indicated that 90% of the hydrocarbons impacting soil had been remedlated A <br /> summary of in-situ bioremediation can be found in the AGE-prepared Quarterly Report-March and <br /> June 1999 dated I 1 August 1999 <br /> Further background information including the site history, description and results of previous <br /> investigations are detailed in the Problem Assessment Report(PAR) dated 31 July 1991, prepared <br /> by FES Environmental,Inc ,and in the AGE-prepared reports Quarterly Report-March 1996 dated <br /> 19 April 1996, Quarterly Report-March and June 1999 dated I 1 August 1999,Cone Penetrometer <br /> Testing Report, dated 19 February 2002 and Quarterly Report - Fourth Quarter 2002, dated <br /> 20 January 2003 <br /> i 3 0. SCOPE OF WORK <br /> AGE is recommending the performance of an ozone injection well pilot study for the area near the <br /> former dispenser island and monitoring well MW-14 The scope of work will consist of the <br /> following tasks <br /> • Permitting, planning and pre-field work activities, <br /> • Drilling and ozone injection well installation, <br /> • Performance of an 24-week ozone sparge pilot test, including monthly monitoring, and <br /> • Preparation of a report on the results of well installation activities and the in-situ ozone <br /> sparge feasibility study <br /> The CVRWQCB suggested,zn the aforementioned 30 October 2003 letter, that a"bench scale test" <br /> be performed prior to implementation of the pilot study to determine if any site-specific conditions <br /> (e g, metal-fouling of injectors) exist that may "render the pilot study ineffective" Based upon <br /> results from several ozone-injection projects in the San Joaquin County area, it has been AGE's <br /> experience that very little iron fouling has been exhibited, the projects include two in the city of <br /> Stockton(Fire Station No 2 and Chase-Van Buren)and one in the city of Ripon(Shockey and Sons) <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.