My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2900 - Site Mitigation Program
>
PR0522056
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 3:24:23 PM
Creation date
5/17/2019 2:50:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0522056
PE
2950
FACILITY_ID
FA0015023
FACILITY_NAME
USA GASOLINE #3502
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ST��iTUS <br /> ENVIRONMENTAL,INC.. Cameron <br /> Cameron Park Drive, Ste 550 <br /> Cameron Park, California 95682 <br /> (530)676-6004-Fax:(530)676-6005 <br /> September 27, 2006 <br /> Project No. 2007-3502-01 <br /> Mr. Harlin Knoll RECUvEDD <br /> San Joaquin County SEP 2 <br /> Environmental Health Department 9 �OQ6 <br /> ENVIRONMENT HEALTH East Weber Avenue, Third Floor <br /> Stockton, California 95202 PEPTOTSERVICES <br /> Subject: Baseline Subsurface Evaluation <br /> USA Station No. 3502 <br /> 35 North Cherokee Lane <br /> Lodi, California <br /> Dear Mr. Knoll: <br /> Stratus Environmental, Inc. (Stratus) has prepared this letter, on behalf of USA Gasoline <br /> Corporation (USA), to obtain drilling permits for baseline environmental evaluation of <br /> subsurface conditions at USA Station No. 3502, located at 35 North Cherokee Lane, <br /> Lodi, California. A completed permit application, a check in the amount of$374.00, and <br /> a copy of a site plan illustrating proposed drilling locations, are attached to this letter. <br /> PROPOSED SCOPE OF WORK <br /> The primary objectives, and proposed activities to achieve these objectives, are presented <br /> below: <br /> • Characterization of subsurface conditions in the vicinity of the underground storage <br /> tanks (USTs), product piping, and dispenser islands using a hollow stem auger drill <br /> rig, <br /> • Collection of soil samples in 5-foot intervals during advancement of the boreholes <br /> to approximately 50 feet below ground surface (bgs). Soil samples will be collected <br /> for lithologic logging, field screening, and possible laboratory analyses, <br /> • Collection of a groundwater sample, if groundwater is encountered in the upper 50 <br /> feet of the subsurface, and <br /> • Preparation of a report presenting the field observations, analytical data, and <br /> recommendations. <br /> The proposed scope of work presented above has been subdivided into tasks 1 through 5. <br /> All geologic work will be conducted under the supervision of a State of California <br /> KAUSA Gasoline\3502\Correspondence\USA3502 Baseline Study letter.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.