My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012581
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
3500 - Local Oversight Program
>
PR0544475
>
ARCHIVED REPORTS XR0012581
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 3:39:12 PM
Creation date
5/17/2019 3:21:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012581
RECORD_ID
PR0544475
PE
3528
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SHELL) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
02
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Station No. 502, 35 N. Cherokee Lane, Lodi, - Interim Remediation Plan <br /> Vacuum Pump <br /> The air stream containing the extracted soil <br /> and fed through the system by a 100 scfm Sutorbilas t vacuum pum the ground <br /> a positive displacement pump. This is <br /> volume flowrate against Pump automatically maintains a constant <br /> developing vacuums of 10 inches of mercuryeOr s. The pump is capable of <br /> be powered by 220 volt electric service from therstation,e. The drive motor wail <br /> Equipment Area <br /> The equipment includes: 1 <br /> Pumping unit, 3) The catalyticnincinerator,��and 4) An exhaust stat Z) A <br /> willpimnt be enclosedebyochain link on a fenc#nwith <br /> foranchor bolts. stack. The <br /> The equipment area <br /> g security purposes. <br /> Propane Trap Wagon <br /> The ca',:alytic incinerator uses propane to fuel a <br /> Which maintains a minimum temperature for the catalyssstemt bed.buThe rpropane <br /> source is a conventional 490-gallon trap wagon located onsite. The <br /> propane will be provided by a local retailer. Actual siting of the wagon <br /> will be determined by Intal Fire Department requirements. Appropriate <br /> f traffic protection will be installed as needed. <br /> CATALYTIC INCINERATOR <br /> The extracted soil vapors will be abated with a i00 scfm EVAX Model, 510 <br /> catalytic incinerator. The extracted air stream first enters the <br /> preheater burner chamber. The air stream from the preheater then enters <br /> the catalytic bed where oxidation of the hydrocarbon vapor occurs. <br /> The catalyst has a hydrocarbon destruction efficiency of at least 95% <br /> when the TVH influent concentration is above 1000 <br /> M. When the concentration is 1000 ppm or lower, the TVH destruction efficiency nisugo% <br /> or better. Destruction efficiencies in excess of these minimum values <br /> t are commonly measured in the field. <br /> Effluent from the incinerator will be released tehrou <br /> attached to the unit to minimize local impgh a 16' stack <br /> act. <br /> Catalytic incinerators are considered to be Toxics Best .Available--Control---- <br /> Technology.-.(r,BACT)-for--vapor--extraction-operatiairs by,.the Bay Area Air <br /> -- --- — --- -- Quality Management District (BAAQMD), a major t <br /> in California. rend-setting air district --- -- - <br /> Optimum catalytic. oxidation eccurs in the temPerature',range between 600 <br /> __- and .1050°F.. The temperature : of the catalyst bed. is <br /> i - monitored <br /> - 1 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.