Laserfiche WebLink
= - <br /> �d <br /> �- Station No. 502, 35 N. Cherokee Lane, Lodi, - Interim Remediation Plan <br /> continuously. The unit is equipped .with an automatic temperature contra, <br /> device which turns off the entire system in the event the catalyst bed <br /> temperature exceeds 10500F or falls below 6000F. The temperature of the <br /> catalyst is recorded continuously. <br /> The temperature of the catalyst bed increases with the concentration of <br /> the influent. The unit is designed for a maximum -influent concentration S <br /> of about 3250 ppm or 25% of the Low Explosive Lisa'>t (LEI.) for gasp?ine. <br /> Specifications for the incinerator are presentedinAppendix C. <br /> x <br /> REGULATORY AUTHORIZATION AND PERMITTING <br /> Authorization to operate the incinerator is required from the San Joaquin <br /> Valley Unified Air Pollution Control District. EVAX Technologies <br /> submitted for the necessary air permits in June 1991. The application s, <br /> was deemed complete by the District in August 1991. The approved <br /> Authority to Construct was issued on 13 January 1992. <br /> Notification of the operation will also be issued to other local agencies <br /> k : including the San Joaquin County Public Health Services and the Fire <br /> Department. <br /> Pursuant to Section 280.67, Subpart F of 40 CFR of the Federal Register, <br /> the public must be notified of the proposed remedial actionplan. To <br /> �.; satisfy this requirement, a:copy. at' this plan will bt: made :available for <br /> public review at the Manteca Library. <br /> i..o Pic <br /> I1 �n-z.s <br /> CATALYTIC INCINERATORINSTALLATION <br /> The catalytic incinerator and accumulator/water knockout device will be <br /> _ delivered to the site, installed in the equipment area and connected to <br /> ` the extraction system. <br /> gym. OPERATION AND MAINTENANCE <br /> t._ The system will`,be operated and maintained by EVAX Technologies Field <br /> Operations Group. These activities will be under the direction of an <br /> _. EVAX Te0nologies Project Engineer: <br /> Start-up <br /> Upon satisfying _ail ' regulatory requirements, operation of the. vapor <br /> extraction system will begin. The vequired source testing will be <br /> - 6 - <br />