Laserfiche WebLink
1 - <br /> SITE CLOSURE EVALUATION REPORT <br /> Beacon Station No. 502 <br /> 35 North Cherokee Lane <br /> Lodi,California <br /> Delta project No. D093-907 <br />' installed in September 1987. Soil samples were collected from soil borings SB-1 through SB-3 in <br /> April 1993. The vapor extraction wells were destroyed in February 1995, and soil samples were <br />' collected during removal and replacement of three underground fuel storage tams in February 1995. <br /> Remedial activities have included installation of a soil vapor extraction treatment system which was in <br /> operation in October and November 1989 and from September 1992 through December 1992. Additional <br /> remedial activities include over-excavation of soil during the tank removal in February 1995. The results <br />' of these investigation have been presented in the following reports: <br /> A Environmental Investigation Related to Storage Tank Removal, Applied Geosystems, dated <br />' October 28, 1986. <br /> tA Subsurface Environmental Investigation, Soil Barings and Monitoring Well Installation, <br /> Applied Geosystems, dated November 6, 1986. <br /> A Letter Report No. 8691-4 Regarding Drilling of Monitoring Well MW-4, Applied <br />' Geosystems, dated February It, 1987. <br />' A Installation of Monitoring Well MW-5, Applied Geosystems, dated April 22, 1987. <br /> Letter Report, Installation of Vapor-Recovery Wells, Applied Geosystems, dated <br /> August 3, 1988. <br /> A Subsurface Investigation Report, Delta, dated July 27, 1993. <br />' A Well Destruction Report Delta dated February Y23, 1995. <br />' A Underground Storage Tank Removal and Soil Sampling, Delta, dated March 21, 1995. <br />' In addition, quarterly ground water monitoring reports have been submitted by other consultants. <br /> RPT 139.SJS <br />