Laserfiche WebLink
I; 4TH Quarter SVES Report,Beacon #502 Lodi <br /> 23 October, 1992 Monitoring <br /> The system was down and operated for 5 days since 22 September 1992. An efficiency <br /> test was conducted for confirmation of system performance. Laboratory results found <br /> destruction efficiencies to be in excess of 96 percent. The results from this test were <br /> submitted to Mark Schonhoff of the San Joaquin Valley Unified Air Pollution Control <br /> District (SJVUAPCD). Wells were not monitored during visit. <br /> Il 02 November 1992 Servicing. <br /> The system was down, but operated 6 days since 23 October 1992. <br /> 03 November, 1992 Monitoring. <br /> The system operated continuously since 02 November 1992. Monitoring was performed <br /> on system influent, effluent and extraction wells. Vapor Wells VW-8 and VW-9 had <br /> concentrations of 550 ppm. An air bag was retrieved from VW-8 to verify field readings . <br /> The results of the analysis was 423 ppm, which confirmed field screening. No adjustments <br /> were made to the wells. <br /> 05 November 1992 Serving <br /> The system was down and had operated 1 day since 03 November 1992. The system was <br /> restated. <br />�4 <br /> 16 November, 1992 Monitoring. <br /> The system operated continuously since 05 November 1992. Monitoring was performed <br /> on influent, effluent and wells. Testing was conducted to determine optimum extraction <br /> scenario for wells VW-8 and VW-9. If both wells were open system vacuum was 6.0 <br /> inches of mercury and the TVH removal rate was 10 pounds per day. When one well was <br /> open the system vacuum was 9.0 inches of mercury and TVH removal rates were 5 and 8 <br /> pounds per day for wells VW-8 and VW-9, respectively. Conclusions from the test were <br /> to keep both wells open, because TVH removal rates were greatest and equipment stress <br /> would be reduced. Monitoring was performed on system influent and extraction wells. <br /> t16 November 1992 Monitoring <br /> The system operated continuously since 06 November 1992. Monitoring was conducted <br /> on influent, effluent and wells. No adjustments were made on system or wells. <br /> 3 <br /> r <br />