Laserfiche WebLink
Spill Prevention Control and Countermeasure Plan Page 32 <br /> ALTAMONT CORRIDOR EXPRESS-RAIL MAINTENANCE FACILITY <br /> W KA No. 10114.02 <br /> June 20, 2017 <br /> Revised August 20, 2019 <br /> 16.0 ENGINEERING CERTIFICATION <br /> Wallace-Kuhl &Associates on behalf of the San Joaquin Regional Rail Commission prepared <br /> this Spill Prevention Control and Countermeasure Plan (SPCCP)for the Altamont Corridor <br /> Express-Rail Maintenance Facility located at 1020 East Alpine Avenue in Stockton, California. <br /> I hereby certify that I am familiar with the requirements of 40 CFR 112 and that I or my agent <br /> have visited and examined the facility. The plan has been prepared in accordance with good <br /> engineering practice, including consideration of applicable industry standards, and in <br /> accordance with requirements of 40 CFR 112; that procedures for required inspections and <br /> testing have been established; and,that this plan is adequate for the facility. <br /> This certification in no way relieves the owner or operator of the facility of his/her duty to prepare <br /> and fully implement this SPCCP in accordance with the requirements of 40 CFR 112. This <br /> SPCCP is valid only to the extent that the facility owner or operator maintains, tests, and <br /> inspects equipment, containment and other devices as prescribed in this SPCCP. <br /> WALLACE-KUHL &ASSOCIATES <br /> iQg(1EESS <br /> „ .2trP m <br /> z Exp. 12-31-19 <br /> *f'.1ro fCNN\c.��'.��e <br /> t <br /> Matthew A. Taylor Michael M. Watad, M.S., P.E., G.E. <br /> Project Manager Senior Engineer <br /> BCY:MAT:MMW:Imat <br />