Laserfiche WebLink
Kyle Christie property owner <br /> page 2 letter to the northernDue to continued <br /> write a from ARCO' pHS/EHD will <br /> PHS/EHD will en Yequest reports, to <br /> upon receipt Of a written monitoring from the standard <br /> receip uarterly date for all other <br /> t °f in quarterly months <br /> late change of same due The <br /> allow a E14CONis heavy load change if desired• <br /> accommodate ARCO is to request the as soon as repairs <br /> soil vapor extractiono PHS/EHD deadlines <br /> quarterlies- inue ere are <br /> site is the system. <br /> are completed on for thARCO Facility <br /> is site. <br /> currently pending #2168 <br /> 441 W. Charter Way, Stockton <br /> contact - Michael Infurna be set up between PHSARCO <br /> PHS/EHD nested that a meeting <br /> ARCO has req Linda Turkatte and Michael Infurnau <br /> representatives ( resentatives, to discuss the <br /> sites and investigations. The future of this site <br /> representatives and Texaco rep <br /> Charter Way undetermined since the lease renewal <br /> as an ARCO facility is the tanks will be <br /> time is near. If the lease is terminated, <br /> removed. ARCO is to advise PHS/EHD of the plans as they are <br /> decided. ARCO plans to drill angle and vertical borings <br /> around the existing tank area, but the work plan has not been <br /> finalized. Onsite monitoring wells MW3 and MW4 have a sheen <br /> on the water and the gradient is still to the northeast. ARCO <br /> discussed that the vapor extraction unit originally planned <br /> for use at 1612 Hammer Lane, Stockton or 225 Cherokee Lane, <br /> Lodi, may be taken to this site instead. ARCO will advise <br /> PHS/EHD of the decision made. There are no PHS/EHD deadlines <br /> currently pending for this site. <br /> c <br /> 25775 Patterson Pass Road, Tracy , <br /> ARCO Facility ¢6100 <br /> PHS/EHD contact - Margaret Laqo <br /> Mr. Robert Vieira has signed the access ag^eement for drilling <br /> on his property. A work plan will be subutted to PHS/EHD and <br /> the work will be conducted this spring. <br /> 501 W. Kettleman Lane, Lodi ARCO Facility #434 <br /> PHS/EHD contact - Margaret Lagorio <br /> The monitoring well replacement MW2 has beh sa -ad and there <br /> were no contaminants detected. This wellwi.i: Ze placed on <br /> the quarterly sampling schedule. The soi generated during <br /> the installation of replacement MW2 was tr*ported by Dillard <br /> Trucking to their facility on December '0, 1994. After <br /> receipt of the sample results, disposalof the soil was <br /> arranged. The biofilter has been permit} by San Joaquin <br /> Valley Unified Air Pollution Control Dis t (SJVUAPCD) so <br /> the catalytic oxidizer currently at ti site will be <br /> transferred to the site at 3425 N. Tracy Ly. , Tracy. <br /> 2908 West Benjamin Holt, Stockton A Facility #2133 <br /> PHS/EHD contact - Mary Meays <br /> PHS/EHD staff indicated that notification Fr to the start- <br />