Laserfiche WebLink
Kyle Christie <br /> Page 3 requested and that due to very <br /> up of the vapor extraction wasswasq unavailable to provide an <br /> short notice, PHS/EHD staff <br /> inspection. PHS/EHD requested that the next time a inspectionecansit <br /> be <br /> is EHD be notified so that an importance, once again, <br /> is made that PHS/ reports. PHS/EHD was also <br /> scheduled. PHS/EHD also stressed the imp <br /> of timely submittal of quarterly <br /> notified that the air Sparging system was started-up. PHS/EHD <br /> regarding the operation of the system <br /> requested information <br /> and indicated that no notification of its start-up was <br /> provided. PHS/EHD also stated that the report of the <br /> additional offsite weals should be <br /> installation of the <br /> submitted as soon as possible. <br /> ARCO ]tcility #2076 <br /> 800 East Kettleman Lane, Lodi <br /> PHS/EHD contact - Mary Meays of the "Fourth Quarte 1994 Status <br /> PHS/EHD was provided a copy <br /> Report" from EMCON. PHS/EHD requested that to quarterly <br /> report be submitted prior to the scheduled quartrly meeting <br /> in order for PHS/EHD staff to evaluate recent resits in order <br /> to discuss site conditions. <br /> 11 <br /> ARCO FAlity 1548 <br /> 1612 Hammer Lane, Stockton <br /> PHS/EHD contact - Mary Meays <br /> PHS/EHD was provided a copy of the "Fourth Quarter 94 Status <br /> EHD requested that theuarterly <br /> Report" from minedEMCONr Por to the scheduled quarter meeting <br /> report be submitted p n order <br /> in order for PHS/EHD staff to evaluate recent result<HD also received copy of <br /> to discuss site <br /> arisonconditions. <br /> between 1612EHammer Lane and ; South <br /> the site comp to evaluate resit soil <br /> Cherokee Lane which was prepared ld be <br /> contamination. PHS/EHD indicated that the report <br /> reviewed and PHS/EHD comments prepared. <br /> 3425 N. Tracy Blvd. , Tracy <br /> ARCO Facili2093 <br /> PHS/EHD contact - Harlin Knoll exist <br /> Groundwater and soil contaminatiostem would beoi stall� <br /> ARCO stated a vapor extraction sy e. <br /> receiving an Authority to Construct" from SJ�er <br /> Construction should begin and be completed during thel- <br /> „ quarter of 1995 according to AR& <br /> quarter of 1995 . Onsite remediation will be on lied <br /> operating by the third q <br /> Brown and Caldwell. Offsite contamination in monitorinc, <br /> initi <br /> but will be monitored and into <br /> managed i al h the futuresystem d, <br /> ARCO Facility # <br /> 85 E. Louise, Lathrop <br /> PHS/EHD contact - Linda Turkatte <br /> The annual report was submitted and the wells show nondet <br /> levels. The possibility of evaluating this site for close <br /> will be discussed at the next quarterly meeting. <br />