My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 4:20:04 PM
Creation date
5/20/2019 9:20:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Robert Vieira • •roject 0805-152.01 <br /> November 14, 1994 <br /> Page 2 <br /> during drilling. Every effort will be made to keep the work area clean and to restore the area to the <br /> original condition when the work is completed. We will contact you to coordinate drilling operations to <br /> determine which day of the week is most convenient. Our tentative schedule for the construction of the <br /> vapor extraction wells is December 1994. Upon receipt of your authorization, we will schedule a date <br /> for our work and we will inform you of that date. <br /> Depending on the findings of this phase of the investigation, we may have to connect the wells to a <br /> remediation system The vapor extraction wells would be used to remove hydrocarbons from soil by <br /> placing a vacuum on the well and drawing the hydrocarbon vapors through a pipeline to a remediation <br /> unit to be located on the ARCO site. <br /> To connect the wells to a remediation unit at the ARCO station will require EMCON and its <br /> contractors to lay horizontal pipeline from the wells to the station. A schematic of the piping design is <br /> shown on Figure 3. This work would take approximately 1 week to complete. If the wells are <br /> connected to a remediation unit, a technician from EMCON would periodically need to gain access to <br /> the wells for data acquisition and maintenance for approximately 1 year, or as required until <br /> remediation is completed. After the soil is remediated and the wells are no longer needed, the wells will <br /> be properly destroyed by drilling them out with a 10-to 12-inch-diameter auger and backfilling the <br /> borehole with neat cement. The ground surface will then be restored to resemble the surrounding <br /> ground material. A boring will be drilled adjacent to each well to collect soil samples to confirm that <br /> hydrocarbons have been removed from the soil; the borings will be backfilled with neat cement. <br /> We appreciate your cooperation in this matter. Please sign and return both copies to our office. We will <br /> forward both copies to ARCO. ARCO will then sign both copies and will return one copy to you for <br /> your files. Upon your authorization to access your property, we will arrange a time to perform the <br /> work and appraise you of the schedule. <br /> Please feel free to call Jay R. Johnson if you have any questions about the work. <br /> Sincerely, <br /> EMCON Associates <br /> Claud <br /> /aly . sonProject Geologist oject Supervisor <br /> Attachments: Figure 1 Area Site Plan <br /> Figure 2 Schematic Weil Design <br /> Figure 3 Cross-section of Vapor Extraction System Trench <br /> ARCO Products Company License Agreement(two copies) <br /> cc: Chuck Carmel, ARCO Products Company <br /> Margaret Lagorio, San Joaquin County Public Health Services <br /> SAC/P10N0805/08051520.1 BM-94/pas:1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.