My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 4:20:04 PM
Creation date
5/20/2019 9:20:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> ° '" Environmental Health Department DIRECTOR <br /> o' c Donna Heran,REFS <br /> �'.O <br /> 1868 East Hazelton Avenue <br /> Q. -r PROGRAM COORDINATORS <br /> `�: mlll Stockton, California 95205-6232 Robert McClellon, REHS <br /> 1149:1. ' v Jeff Carruesco,REFS, RDI <br /> Kasey Foley,REHS <br /> • Cq�rFOR�`P Website: www.sjgov.org/ehd Linda Turkatte,REHS <br /> Phone: (209) 468-3420 <br /> Fax: (209) 464-0138 <br /> September 12, 2012 <br /> Randy Coil 00 <br /> Atlantic Richfield Company <br /> 501 Westlake Park Blvd. ' y�'t <br /> WL1-28.160B <br /> Houston,TX 77079 <br /> Subject: ARCO Service Station No. 6100 LOP Site Code: 1708 <br /> 25775 S. Patterson Pass Road <br /> Tracy, California, 95377 <br /> WORK PLAN: Remedial Action Plan <br /> DATED: July 10, 2012 <br /> PREPARED BY: Arcadis U.S., Inc. <br /> APPROVED: [X] <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25296.10 (c)(3)]: <br /> 1. To install nine additional air sparge (AS) wells off-site. <br /> 2. The sparge wells will be 2 inches in diameter, advanced to approximately 116 feet bgs, <br /> and will be 30 foot on center from one another. <br /> 3. Utilizing the nine AS wells and other existing wells, design and engineer a soil vapor <br /> extraction/air sparge (SVE/AS) remediation system to perform off-site soil and ground <br /> water remediation.. <br /> 4. Soil will be collected continuously during AS well installation and will be logged for visual <br /> classification and field screened with a PID for VOCs. <br /> 5. After the SVE/AS remediation system in installation and the system is operational, <br /> monitoring will be performance. The initial monitoring will be performed weekly and <br /> bimonthly thereafter. Typical monitoring will include: measurement of the extraction <br /> vapor flow rates and concentrations, measurement of the sparge point flow rates and <br /> pressures. <br /> 6. Arcades will provide final installation and remediation reports to the EHD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.