My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 4:18:47 PM
Creation date
5/20/2019 9:20:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vieif a Rauch LTD Project No. D000-340 <br /> April 4,2001 <br /> Page 2 <br /> Delta anticipates the work will be completed in approximately two weeks. Three <br /> subcontractor personnel will operate the drill rig, and a geologist from Delta will be <br /> present during drilling. Every effort will be made to keep the work area clean and to <br /> restore the area to the original condition when the work is completed. We will contact you. <br /> to coordinate drilling operations and to determine an appropriate time to initiate the <br /> fieldwork. If the soil borings are converted to groundwater monitoring wells, periodic <br /> access will be necessary to monitor and sample the wells. Our tentative schedule for the <br /> drilling of the soil borings is May 2001. Upon receipt of your authorization, we will <br /> schedule a date for our work and we will inform you of that date. <br /> We appreciate your cooperation in this matter. Please sign and return both copies of the <br /> License Agreement form to our office. We will forward both copies to ARCO. ARCO <br /> will then sign both copies and one copy will b11 ed tome to your <br /> filethe work and <br /> Upon Your <br /> authorization to access your property, arrange <br /> apprise you of the schedule. <br /> Please contact me at(530) 676-6000 if you have any questions regarding this matter. <br /> Sincerely, <br /> DELTA ENVIRONMENTAL. CPNSULTANTS,INC. <br /> Jay Johnson,R.G. <br /> project Manager <br /> cc: Ms.Margaret Lagorio, San Joaquin County Public Health Services Environmental <br /> Health Division <br /> Attachments: License Agreement(two copies) <br /> Proposed Boring Locations Map <br /> \\FrontWrco\6100\CORRES\6100-AuchTolnsmll.doe <br /> L0/L0 39tid dI7VO ON sniv is 90099L90ES 0b:80 E00Z/80/60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.