My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 1:58:26 PM
Creation date
5/20/2019 1:40:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRON H <br /> MENTAL EDEPARTMENTALTH <br /> N SAN JOAQUIN COUNTY Unit Supervisors <br /> OP,....... C <br /> �'� —"'� �� Third Floor Carl Borgman,R.E.H.S. <br /> r.` !-'� ?� Donna K.Heran,R.E.H.S. 304 East Weber AVeriUe, Mike Huggins,R.E.H.S.,R.D.I. <br /> W < Director California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> Al Olsen,R.E.H.S. StOClCton, <br /> Margaret Lagorio,R.E.H.S. <br /> _ P Program Manager Telephone: (209) 468-3420 Robert McClellon,R.E.H.S. <br /> c4 i F o'R`'' Laurie A.Cotulla,R.E.H.S. Fax: (209) 464-0138 Mark Barcellos,R.E.H.S. <br /> Program Manager <br /> PAUL SUPPLE FEB 2 4 2004 <br /> ARCO PRODUCTS COMPANY <br /> P O BOX 6549 <br /> MOR.AGA CA 94570 <br /> RE: ARCO <br /> 225 Cherokee Lane <br /> Lodi, CA <br /> San Joaquin County Environmental Health DepartmentWPA) daDted as reviewed January 2004k Plan <br /> Addendum for Soil and Groundwater Assess <br /> ment prepared by URS Corporation for the abovenaddendum <br /> was prepared in response to the EHD conditional work plan approval letter dated <br /> 20 January 2004. <br /> EHD approves the modification of the scope of work previously <br /> 2004 and approved yrk Plan <br /> by <br /> for Soi!and Groundwater Assessment dated 13 January <br /> letter dated 13 January 2004, as described in the WPA. The scope of work now includes <br /> a first phase with installation of three soil borings <br /> ground 9 ab ground water sampling d water monitoring well, one <br /> nd a <br /> second phase with installation of one onsite p gg <br /> shallow off-site ground water monitoring well and to three additional shallow ground <br /> water monitoring wells as needed to properlyonitor the plume. <br /> If you have any questions contact Margaret Lagorio at (209) 468-3449. <br /> Donna Heran, REHS <br /> Director of Environmental Health - <br /> Margaret Lagorio, RENS <br /> Nuel C. Henderson, Jr., RG Supervisor, Site Mitigation <br /> Site Mitigation Unit <br /> Unit <br /> c: URS -Vernon Elarth <br /> CVRWQCB-Jim Barton <br />
The URL can be used to link to this page
Your browser does not support the video tag.