Laserfiche WebLink
April 7, 1992 <br /> ARCO Service Station No. 760, Lodi, California <br /> I <br /> tank cavity We collected soil sample 5-12-T8. Soil removed around tank T8 was stockpiled <br /> separately between the station building and the western dispenser island <br /> I <br /> Saml2ling Soil Under the Former Product-Lines Trenches <br /> The former product lines were removed and the underlying soil was excavated to <br /> approximately 3 feet below grade on July 5, 1991 Soil samples S-3-PL1 through S-3-PL6 <br /> were collected from the product-line trenches at approximately 20-foot intervals at locations <br /> shown on Plate 3 fExcavatibn of tfie:product-line trenches-continued on July-8, 1991, and <br /> soil sample S-3-PL7 was-collected under the eastern dispenser, sit in_tLts area wa <br /> iscolored and produced a hydrocarbon odor Samples were submitted to the laboratory for <br /> analyses <br /> 1� <br /> Vent lines were removed on July 11, 1991, a SJCPHS-EHD representative was onsite No <br /> subjective evidence was detected in soil removed from the vent-line trenches No soil <br /> samples were collected pursuant to verbal approval by the SJCPHS-EHD <br /> 1 <br /> Removal of Tank T9 <br /> D�unng t�excavatio of roduct ine trenches a 200-gallon_t.�.nk_co.�taining fluid w�§ <br /> 1 uncovered w saf the_p ( uct lines Plate We designated the tank T9 Golden West <br /> obtained a permit from the SJCPHS-EHD to remove the tank On July 17, 1991, RESNA <br /> observed Norcal of Denair, California, remove the contents of the tank and then the tank <br /> 1 Soil sample S-8-T9 was collected under the former tank At ARCO's request, the tank was <br /> transported by H and H Shipping Services to their facility <br /> 1 � <br /> 38048-5 9 <br />