My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001725
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001725
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:25:52 PM
Creation date
5/20/2019 2:00:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001725
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 7, 1992 <br /> ARCO Service Station No. 760, Lodi, California <br /> I <br /> tank cavity We collected soil sample 5-12-T8. Soil removed around tank T8 was stockpiled <br /> separately between the station building and the western dispenser island <br /> I <br /> Saml2ling Soil Under the Former Product-Lines Trenches <br /> The former product lines were removed and the underlying soil was excavated to <br /> approximately 3 feet below grade on July 5, 1991 Soil samples S-3-PL1 through S-3-PL6 <br /> were collected from the product-line trenches at approximately 20-foot intervals at locations <br /> shown on Plate 3 fExcavatibn of tfie:product-line trenches-continued on July-8, 1991, and <br /> soil sample S-3-PL7 was-collected under the eastern dispenser, sit in_tLts area wa <br /> iscolored and produced a hydrocarbon odor Samples were submitted to the laboratory for <br /> analyses <br /> 1� <br /> Vent lines were removed on July 11, 1991, a SJCPHS-EHD representative was onsite No <br /> subjective evidence was detected in soil removed from the vent-line trenches No soil <br /> samples were collected pursuant to verbal approval by the SJCPHS-EHD <br /> 1 <br /> Removal of Tank T9 <br /> D�unng t�excavatio of roduct ine trenches a 200-gallon_t.�.nk_co.�taining fluid w�§ <br /> 1 uncovered w saf the_p ( uct lines Plate We designated the tank T9 Golden West <br /> obtained a permit from the SJCPHS-EHD to remove the tank On July 17, 1991, RESNA <br /> observed Norcal of Denair, California, remove the contents of the tank and then the tank <br /> 1 Soil sample S-8-T9 was collected under the former tank At ARCO's request, the tank was <br /> transported by H and H Shipping Services to their facility <br /> 1 � <br /> 38048-5 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.