My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001725
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001725
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:25:52 PM
Creation date
5/20/2019 2:00:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001725
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 7, 1992 <br /> ARCO Service Station No 760, Lada, California <br /> Approximately one third of the pea gravel from backfill remained in the hole. Soil <br /> excavated from the new tank cavity was then placed on top of the geofabnc <br /> We observed the excavation of the new tank cavity to 12 feet below grade on June 19, 1991 <br /> The limits of the new tank cavity are shown on Plate 3 The excavated soil was placed on <br /> the geofabnc in the former tank cavity The soil was later sampled and characterized, as <br /> discussed below <br /> We observed Golden West excavate a trench to approximately 12 feet below grade from <br /> west to east across the new tank cavity to obtain samples of native soil Soil samples S-12- <br /> T4, S-12-T5, S-12-T6, and S-12-T7 were collected before the new tanks were installed The <br /> sample locations are shown on Plate 3 In addition, soil samples S-12-T6N and S-12-T6S <br /> . were collected from the northern and southern limits of the new tank cavity <br /> 1 <br /> On June 19, 1991, a 550- alhon_tank_{designated T8 onPlate-3 was uncovered south of the <br /> sample trench while excavating the remaining area of the new tank cavity The tank <br /> contained soil and liquid Our geologist placed the PID probe inside the fillport of the tank <br /> and recorded a reading of 400 parts per million by volume A sample of the liquid (labeled <br /> W-6-T8) was collected by lowering_a teflon bailer into the tank The liquid was submitted <br /> to the laboratory <br /> 1 <br /> Golden West obtained a permit from the SJCPHS-EHD to remove the tank RESNA <br /> observed the removal of tank T8 on June 21, 1991 r geo- gis note a Western_ Oil <br /> qCo� y -=ignxa--on the -tan.� and a label that indicated the tank- formerly contained <br /> oh e At ARCO's request, the tank was transported and disposed of by H and H <br /> Shipping Services With authonzation from the SJCPHS-EHD, we observed the contractor <br /> excavate 4 feet below the former tank to 12 feet below grade, the final depth of the new <br /> r � <br /> 38048-5 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.