My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001801
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:45:48 PM
Creation date
5/20/2019 2:06:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001801
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OVERVIEW <br /> This section presents a brief summary of practices requested by Arco Products Company that are not <br /> normally included in the Groundwater Technology Inc Standard Operating procedures referenced <br /> above The practices were compiled from the Request for Bid for Groundwater Sampling at ARCO Retail <br /> Facilities in Northern California letter dated November 11, 1993, by Mr Kyle Christie These practices <br /> are included for Arca sites for which Groundwater Technology perforins the monitoring and sampling <br /> activities <br /> a) Use only Arco Products Chain-of-Custody Forms For groundwater sample identification the <br /> depth the sample was collected is placed neat to the well identification (i.e. MW10-5, means the <br /> sample for monitoring well MW-10 was collected at 5 feet below grade) The laboratory will be <br /> notified its advance of the arrival of groundwater samples <br /> b) Measure depth to bottom of the monitoring wells for the first event only <br /> C) Be consistent with the type of equipment used during the purging of groundwater monitoring <br /> wells For example, if a monitoring well is consistently hand bailed during purging do not switch <br /> to pumping to purge the well <br /> d) Use four 4400t orange cones when accessing monitoring wells in driveways or parlang lots. <br /> e) Feld personnel must have station manager approval before disposing of trash generated during <br /> field activities in on-site containers <br /> f) Fill out field reports, groundwater sample field data sheets, and summary of groundwater <br /> monitoring sheet (to be stamped by a California registered geologist or engineer) for each site <br /> for documentation of field activities Copies of these forms are included with this attachment for <br /> reference. <br /> g) Maintain well identification symbols and dear well boxes of debris as necessary <br /> h) Purge three (3) well volumes of groundwater from the monitoring wells prior to groundwater <br /> sample collection <br /> r <br /> 1 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.