Laserfiche WebLink
KAYO OIL COMPANY QUARTERLY 3T4TV3 REYUKT <br /> - - ' CALIFORNIA UST PROJECTS" <br /> AUGUST 1, 1988 �Ild <br /> 3Site Name : FAST GAS STATION 3Project, Status : Remediation 3 <br /> 3Address : 800E HWY 12 3 3 <br /> 3 Lodi, CA 3Fuel Present : 1 to 2 inches 3 <br /> 3 3 3 <br /> 3Consultant: Du Pont Biosystems 3Project MGR: Greg Fletcher 3 <br /> 3 3Project Inception Date : 06/85 3 <br /> 3 3 3 <br /> 1. HISTORICAL DATA: Site identified as a Mc Alpine flange problem, <br /> tanks repaired . Environmental assessment conducted, free product on <br /> groundwater, extensive dissolved contamination problem and minor soil <br /> contamination. Horizontal and vertical extent of problem defined. <br /> State regulators requiring further definition. Remediation Plan <br /> currently being developed . Estimates of lost product are approximately <br /> 8,5000 gallons based on the size of the plume and the adsorbed product <br /> on the soil . <br /> 2. SCENT ACTIVITY; Final Remedial Plan reviewed and aftepted `by State <br /> on June 28, 1988 . Currently working on obtaining variance permits to <br /> Install remediation wells within 50 feet of sewer . <br /> 3. PROJECTED ACTIVITIES: <br /> . 3 MONTH 3 DESCRIPTION 3 <br /> 3 August 3 System maintenance 3 <br /> 3 3 3 <br /> 3 September 3 Remediation equipment purchase 3 <br /> 3 3 3 <br /> 3 October 3 Remediation equipment installation 3 <br /> 3 3 3 <br /> 3 November 3 Remediation system start up and operation 3 <br /> 3 3 3 <br /> 3 December 3 System operation & testing 3 <br /> 3 3 3 <br /> 3 January 3 System operation 3 <br /> 3 3 3 <br />