My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
3500 - Local Oversight Program
>
PR0544482
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 4:32:17 PM
Creation date
5/20/2019 3:51:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544482
PE
3528
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
02
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KAYO OIL COMPANY QUARTERLY 3T4TV3 REYUKT <br /> - - ' CALIFORNIA UST PROJECTS" <br /> AUGUST 1, 1988 �Ild <br /> 3Site Name : FAST GAS STATION 3Project, Status : Remediation 3 <br /> 3Address : 800E HWY 12 3 3 <br /> 3 Lodi, CA 3Fuel Present : 1 to 2 inches 3 <br /> 3 3 3 <br /> 3Consultant: Du Pont Biosystems 3Project MGR: Greg Fletcher 3 <br /> 3 3Project Inception Date : 06/85 3 <br /> 3 3 3 <br /> 1. HISTORICAL DATA: Site identified as a Mc Alpine flange problem, <br /> tanks repaired . Environmental assessment conducted, free product on <br /> groundwater, extensive dissolved contamination problem and minor soil <br /> contamination. Horizontal and vertical extent of problem defined. <br /> State regulators requiring further definition. Remediation Plan <br /> currently being developed . Estimates of lost product are approximately <br /> 8,5000 gallons based on the size of the plume and the adsorbed product <br /> on the soil . <br /> 2. SCENT ACTIVITY; Final Remedial Plan reviewed and aftepted `by State <br /> on June 28, 1988 . Currently working on obtaining variance permits to <br /> Install remediation wells within 50 feet of sewer . <br /> 3. PROJECTED ACTIVITIES: <br /> . 3 MONTH 3 DESCRIPTION 3 <br /> 3 August 3 System maintenance 3 <br /> 3 3 3 <br /> 3 September 3 Remediation equipment purchase 3 <br /> 3 3 3 <br /> 3 October 3 Remediation equipment installation 3 <br /> 3 3 3 <br /> 3 November 3 Remediation system start up and operation 3 <br /> 3 3 3 <br /> 3 December 3 System operation & testing 3 <br /> 3 3 3 <br /> 3 January 3 System operation 3 <br /> 3 3 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.