My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
3500 - Local Oversight Program
>
PR0544482
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 4:32:17 PM
Creation date
5/20/2019 3:51:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544482
PE
3528
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
02
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KAYO OIL COMPANY - QUARTERLY STATUS REPORT <br /> CALIFORNIA UST PROJECTS <br /> AUGUST 11 1988 V <br /> 3Site Name: DOUGLAS GAS STATION 3Project Status : Site Assessment 3 <br /> 3Address : 900 S Cherokee Lane 3 3 <br /> 3 Lodi, CA 3Fuel Present: Yes 3 <br /> 3 3 3 <br /> 3Consultant: Alpha Geotechnical 3Project MGR: Gregory Fletcher 3 <br /> 3 3Project Inception Date: 07/85 3 <br /> 3 3 3 <br /> 1. HISTORICAL DATA: A tank test in August 1985 revealed a leaking tank <br /> and repairs were made . Fourteen monitoring wells were installed by Fox <br /> Environmental during 1985 and 1986 . Three wells were abandoned by GMS <br /> Associates because they cross connected two aquifers . Alpha <br /> Geotechnical was contracted to develop a preliminary report to <br /> completely define extent of contamination in both soil and groundwater . <br /> Six monitoring wells and five borings were installed by Alpha during <br /> beer. Pr >llvinary results Indicate that contaminatkaw is , <br /> throughout property. Two off site wells are necessary to define the <br /> extent of groundwater contamination. Currently waiting on off site <br /> access. <br /> 2. RECENT ACTIVITY: Pursuing off site access and well permits from San <br /> Joaquin - County Health District. <br /> 3 . PROJECTED ACTIVITIES: <br /> 3 MONTH 3 DESCRIPTION 3 <br /> 3 August 3 Obtain off site access and well permits 3 <br /> 3 3 3 <br /> 3 September 3 Install 2 wells 3 <br /> 3 3 3 <br /> 3 October 3 Generate PAR 3 <br /> 3 3 3 <br /> 3 November 3 Generate FRP Report 3 <br /> 3 3 3 <br /> 3 December 3 Quarterly monitoring 3 <br /> 3 3 3 <br /> 3 3a4uarar 3 Petting, discussion, design of system 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.