My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
3500 - Local Oversight Program
>
PR0544482
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 4:32:17 PM
Creation date
5/20/2019 3:51:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544482
PE
3528
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
02
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XU <br /> 8 <br /> f <br /> kz: a x <br /> i2 s .-.- <br /> A tri+ n s v <br /> � k ' work <br /> .: <br /> • ¢. v,,,..Y`Gy Jt�i"'i� P �'�1 a5 � f J d {� ✓ L.r,r. 2 .. <br /> Fast, <br /> Env. Assessment Consultant: Du Pont <br /> A grbOAwattt recouer /tr:eatment system, has been installed at <br /> this 's"ite stride "Vovember-�-1985. Aground rater recovery well has <br /> been o rete a'W is "1l1nq•.the contaminated water back toward <br /> x ..r <br /> this t �,: t°•:; ,A S"itu $ioclamation. croup has prepated <br /> y „ su st#-gat o ` nd bo-hw. ei . <br /> ie ecl den ,•--dbita nation=. ,� This plan was submitted to <br /> fi , weld` work outlined in plan has been conducted, <br /> cantaminOtiaw axtends beyond limits of drillings , further <br /> explotatlon eQujtred, `propezty access in progress, permit applf- <br /> catfon submitted . Vineyard too wet for drilling access. <br /> Periodic monitoring being conducted. Final report due early <br /> 198. <br /> Econo Ga <br /> A IL <br /> r� »r "• <br /> on, CA <br /> Env. Assessment Consultant : Du Pont <br /> Phase II and III has been completed. Wells are being developed <br /> and sampled . Extraction well for pump test will be installed <br /> January 21, 1988- Pump test to be conducted early February. <br /> Groundwater sempling and analysis for Quarterly report . Draft <br /> PAR due March; 1988 . <br /> ` Fast Gas <br /> 1919 West Clinton <br /> Fresno, CA <br /> Env. Assessment Consultant: Applied GeoSystems <br /> Remediation Consultants Applied GeoSystems <br /> This property is leaned by Kayo , and will be , returned to the <br /> property ownet It is my understanding that it will be leatsed <br /> to anothlir pity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.