My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012580
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
3500 - Local Oversight Program
>
PR0544482
>
ARCHIVED REPORTS XR0012580
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 5:51:49 PM
Creation date
5/20/2019 4:11:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012580
RECORD_ID
PR0544482
PE
3528
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
02
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1058
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-�-�� ��� :� �.-�e= �•T-•9O+'Z�.r� 1,, " � _ -fn-� lu �3` '�:��.1.' .�s � - �®�-D...Ns�. <br /> - <br /> y .> <br /> ultramar <br /> W-W <br /> Ultramar Inc. VL-,.1,,;, Yeleccp� `209 5 63-3 3 30 CrMAdmr 8 rative sa!e <br /> P O Bo,4fti 265-563-3330 Admmistra?we <br /> 525 Tn,rd S:r a; 209.583-3302 Informa:wn Services <br /> Ha�!crd.CA 93222.0:C6 209.583-3358 A,xoum',ng <br /> (2G31 S62 02.1 <br /> ENVIRONMENTAL PROJECT <br /> QUARTERLY STATUS REPORT <br /> DATE REPORT SUBMITTED: November 21, 1991 <br /> QUARTER ENDING: September 30, 1991 L <br /> SERVICE STATION NO.: 595 <br /> ADDRESS: 900 South Cherokee Lane, Lodi, California 1 `r <br /> COUNTY: San Joaquin <br /> ULTRAMAR CONTACT: Kenneth R. Earnest TEL. NO: 209-583-5571 <br /> BACKGROUND: <br /> Ultramar purchased site from Conoco in July 1990, Several <br /> ground-water monitoring wells had been installed by Conoco <br /> (formerly Kayo Ail Company) at and- near the site. At the time <br /> of site purchase, all but six wells (RW-1, Mei-16, MW-18, <br /> I 3 MW-20, MW-21, and MW-25) were dry. <br /> r - <br /> In March 1991, one additional ground-water monitoring/vapor- <br /> extraction well (MW-27) and one vapor-extraction well (VH-26) <br /> were installed as part of the installation of a vapor <br /> extraction system designed and permitted for the site. Soil <br /> and ground-water analyses showed nondetectable to moderate <br /> TPHg and benzene concentrations. <br /> Permitting for the system was completed and the vapor ;Y <br /> extraction system was installed early in the third quarter <br /> 1991. <br /> A permit application for a 500 scfm catalytic incinerator was <br /> approved by the AP:D and the system was initiated on September <br /> 20, 1991. <br /> SUMMARY DE THIS QUARTER'S ACTIVITIES: <br /> S <br /> Quarterly groundwater . monitoring was performed on September <br /> 20, 199I. <br /> -- ---------- -- - - --- - As- of November--laf -1991 a--total- of -13,377--pounds---of - -- <br /> hydrocarbons have been destroyed utilizing vapor extraction <br /> (equivalent to approximately 2,100 gallons of gasoline). . <br /> BEACON <br /> A Member of the Ultramar Group of Cumpanies ut<prarit+pna Srr,irc <br /> i! <br />
The URL can be used to link to this page
Your browser does not support the video tag.