Laserfiche WebLink
Quarterly Site Status Report <br /> Beacon Station 695 - Lodi, California ,, <br /> Page 2 ., <br /> RESULT OF QUARTERLY MONITORING: ��(i��t •,';'i '' Y 's� <br /> Laboratory analysis of the groundwater sample collected from <br /> well (MW-27) at the center of the site shows the highest TPHg <br /> and BTEX concentrations (benzene concentration of 46 ppb). <br /> Other well analytical data shows the benzene ground-water <br /> plume to be defined to nondetectable levels to the north. <br /> Ground-water potentiometric surface elevation data indicates <br /> that ground-water flow is toward the southeast. <br /> PROPOSED ACTIMITY OR WORK FOR-NEXT QUARTER: <br /> TIYITY ESTIMATED COMPLETION DATE <br /> Prepare a Work Plan for more groundwater <br /> monitoring wells Late Fourth Quarter 1991 <br /> Perform Fourth Quarter ground-water <br /> monitoring event December 1991 <br /> } <br />