My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012580
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
3500 - Local Oversight Program
>
PR0544482
>
ARCHIVED REPORTS XR0012580
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 5:51:49 PM
Creation date
5/20/2019 4:11:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012580
RECORD_ID
PR0544482
PE
3528
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
02
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1058
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M_ <br /> - , .`,;=. r Fug'" r png;gZ1 g 0 1a L ml_ � 1 11 '� � �" ` <br /> _ u <br /> 0-0 <br /> EVATEc8KNOLOGEs,INC. <br /> 1ff9 Mamf Hermon F�. <br /> surf&1111 - <br /> Sias Wey.CA 95066 <br /> 14016)438-75'1 <br /> FAX(409)AW-7515 <br /> 10 April 1991 <br /> APR 2 2 +dot <br /> Mr. Glenn Dembroff PEF'ti4iT.ISCt,'111irFS <br /> Ultramar Inc. <br /> 525 West Third Stref.t <br /> Hanford, California 93230 - <br /> SUBJECT: Proposal for Vapor Extraction Soil Pemediation ProGram for <br /> BEarr, Service'Station No. 695, 900 South Cherokee Lane, Lodi, <br /> California <br /> Dear Mr. Dembroff: <br /> EVAX Technologies, Inc. (EVA:) is pleased to submit this proposal to <br /> install and operate a remediation system at the subject site. The <br /> results of the PerformancE Test conducted by EVAX in November. 1990 <br /> indicate that vapor extraction i5 a viable option for remediation of the <br /> soils at the subject site. The Performance Test showed vapor extraction <br /> radii of influence greater than 50 feet. Data obtained during the site <br /> investigation have been used to prepare the final remediation system <br /> a design specifications and develop a program for operation of the system. <br /> The proposed vapor extraction system is presented in Figure 1. This <br /> proposal outlines the activities associated with sy::.tem installation and <br /> operation. <br /> SOIL VAPOR EXTRACTION PROGRAM <br /> The vapor extraction program will proceed in five tasks: 1) Construction <br /> Services, 2) Well Installation, 3) Equipment Installation, 4) Operation <br /> and Maintenance, and 5) Project Management and Review and Report Writing. <br /> CONSTRUCTION SERVICES ' <br /> Field Installation <br /> Trenches will be dug and pipes laid according to the system design. <br /> Specifications for the common trenches are given in Detail T-1 of Figure <br /> _--2-. The_. temporary-vapor___extraction-probes--will-be_driven--pneumaticall y--- -- -- --.--- <br /> -into the soil . Selected monitoring wells, including the newly installed <br /> ' groundwater and vadose zone monitoring wells, will be retrofitted for use <br /> in the system. Well head details for conventional wells are given in <br /> Detail. VW-1, Figure 2. The probes and wells will be connected to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.