My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012580
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
3500 - Local Oversight Program
>
PR0544482
>
ARCHIVED REPORTS XR0012580
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 5:51:49 PM
Creation date
5/20/2019 4:11:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012580
RECORD_ID
PR0544482
PE
3528
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
02
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1058
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> Y. <br /> f <br /> Project 02260.04 10 April 1991 <br /> piping and the piping will be connected to the manifold. The manifold <br /> will then be piped to the equipment area. Although much of the system <br /> piping will be installed below grade, the m-in line piping will be above <br /> grade (Detail ML-1, Figure 2). This above-ground main line pipe has been <br /> approvc-d by the Lodi Fire Department. Specifications for the temporary <br /> vapor extraction probes, 4- and 6-inch vapor extraction wells, and the <br /> manifold box are given in Details VEP-1, VW-1 and V-2, and M-1 of Figure <br /> 2, respectively. <br /> WELL INSTALLATION <br /> EVAX will arrange and Supervise the installation of two monitoring wells, <br /> one groundwater monitoring well, MW-25, and one vac'ose zone monitoring <br /> well, VW-26. The wells will be screened at depth intervals of 40 to 75 <br /> feet and 30 to 60 feet below grade, respectively. During drilling <br /> activities, EVAX will sample soils for laboratory analysis and log the <br /> soils° encountered in accordance with the Unified Soil Classification <br /> System. EVAX will arrange for transport of the soil samples, under chain <br /> of custody documentation, to an analytical laboratory. <br /> EQUIPMENT INSTALLATION <br /> The system equipment, including a 500 cubic feat per minute (cfm) <br /> catalytic incinerator, pumping unit, and accumulator/water knockout <br /> device, will be delivered to the site, installed or, an equipment pad, and <br /> connected to the extraction system. Specifications for the <br /> accumulator/water knockout device are given in Detail EQ-1 of Figure 2. <br /> OPERATION AND MAINTENANCE <br /> i <br /> Catalytic Incinerator Start-up <br /> The vapor extraction system operation will be initiated. The required ' <br /> source test,ng will be performed to ensure compliance with permitted <br /> emission conditions. Hydrocarbon concentration as vapor at each probe <br /> and well will be recorded to establish a baseline to gauge the progress <br /> of the remediation. <br /> Operation <br /> The catalytic incinerator will operate 24 hours per day, seven days per <br /> week. The system will be monitored and adjusted twice monthly. <br /> Monitoring will include analyzing the influent hydrocarbon concentrations <br /> --------- -- - - --- -- -to- <br /> -document-the--progres -of.--theremed.iatio - and compliance sampling of <br /> s -. <br /> the exhaust stream A the atmosphere ensure that system oper <br /> to ation-is —---- <br /> within permitted emission conditions. The individual extraction probes <br /> - 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.