Laserfiche WebLink
Project 02260.04 10 April 1991 <br /> and wells will be monitored at that time to document the progress of the <br /> remediation. Extraction at an individual probe or well will be <br /> discontinued when hydrocarbon vapor concentration has been reduced in the <br /> vicinity of that probe or well. <br /> Diagrams illustrating the expected shallow and deep zone capture radii <br /> for the site are given in Figures 3 and 4, respectively. In our opinion, <br /> the vapor extraction system design will allow for eFfective remeWiation <br /> of the majority of hydrocarbon-affected soils beneath the site. <br /> PROJECT MANAGEMENT AND REVIEW AND REPORT WRITING <br /> Project Management will coordinate the system monitoring, review and <br /> submit the results of the monitoring to the regulatory agency to ensure <br /> compliance with regulations, and prepare brief bimonthly reports for <br /> Ultramar Inc. that include the results of the monitoring. <br /> Thank you for the opportunity to propose to install and operate a <br /> remedial system at this site. If you have any questions, please do not <br /> hesitate to call . <br /> yam• . <br /> Sincerely, <br /> EVAX Technologies, Inc. ' <br /> PeLp, le-5 <br /> Christopher J. Peoples <br /> Project Engineer <br /> pbw <br /> Enclosures: Figure 1 Proposed Vapor Extraction System <br /> Figure 2 Beacon Ga=. Station #695 Details <br /> Figure 3 Shallow Zone Capture Radii <br /> Figure 4 Deep Zone Capture Radii <br /> cc: Mr. James Maughan, Regional Water Quality Control Board <br /> __--- ----.__ - — Mrs Steve--Raddigan;--Lodi FirDepartment -- - <br /> 4 Ms. Eleanor Ratliff, San Joaquin Public Health Services <br /> 3 J <br /> - 3 - <br />