My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012580
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
3500 - Local Oversight Program
>
PR0544482
>
ARCHIVED REPORTS XR0012580
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 5:51:49 PM
Creation date
5/20/2019 4:11:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012580
RECORD_ID
PR0544482
PE
3528
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
02
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1058
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 April 1991 <br /> Project 02260.04 <br /> P <br /> nifold <br /> piping and the piping will equipment area. Althoughto the fmuch ofhtheasystem <br /> will then be piped to Q <br /> piping will be installed below <br /> the main line pi ping will be above <br /> grade (Detail ML-i, Figura 2). Thie <br /> This above-ground main line pipe has been <br /> approved by the Lodi Fire Department. Specifications for the temporary <br /> vapor dxtboxtare givensin Details VEP-1t, Vwp1randxVWa2, andwM-lsofaFrigure <br /> manifol <br /> 2, respectively. <br /> WELL INSTALLATION <br /> EVAX will arrange and supervise the installation of two monitoring wells, i <br /> one groundwater monitoring well, adose zone monitoring <br /> MW-25, and one v <br /> to 75 <br /> well , VW-26. The wells will be screened at depth intervals of <br /> drilling <br /> feet <br /> feet and 30 to 60 eet below grade, respectively.anal sis and log the <br /> activities, EVAX will sample soils for laboratory Y <br /> soils encountered in accordance with the Unified Soil C1auridercchapn <br /> System. EVAX will arrange for transport of the soil samples, <br /> of custody documentation, to an analytical laboratory. <br /> EQUIPMENT INSTALLATION <br /> The system equipment, including <br /> unit, and <br /> andbic feet accumulator/waterer mlutknockou� <br /> catalytic incinerator, p P 9 an <br /> device, will be delivered to the site, installed ecificatuonsentfoorpad, the <br /> connected to the extraction system. P <br /> accumulator/water knockout device are given in Detail EQ-1 of Figure 2. <br /> OPERATION AND MAINTENANCE <br /> Catalytic Incinerator Start-up <br /> The vapor extraction sYsired <br /> erro°medattonensure will bcomp3ianceerwithheperm�itted <br /> S testing will be p <br /> emission conditions. Hydrocarbond to con cenarbaseline sto gaugeathe aprogress <br /> blish <br /> and well will be recorde <br /> Of the remediation. <br /> 0peratioi3 <br /> The catalytic incinerator will operate 24 hours per day, seven days per <br /> week. The system will be mot eo <br /> Monitoring will include 'analyzing influent hydrocarbonand adjustedtconcentrathons <br /> to doc��: nt the progress of the remediation and compliance sampling o <br /> on is <br /> the exhaust stream to the atmosphere to ensure that system operatirobes <br /> 1 <br /> within permitted emission conditions. The individual extraction p <br /> — =--- -- -. _ -- -- - —---------------------- ------ -- <br /> - <br /> K <br /> r <br /> f, <br />
The URL can be used to link to this page
Your browser does not support the video tag.