My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012580
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
3500 - Local Oversight Program
>
PR0544482
>
ARCHIVED REPORTS XR0012580
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 5:51:49 PM
Creation date
5/20/2019 4:11:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012580
RECORD_ID
PR0544482
PE
3528
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
02
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1058
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Project 02260.04 10 April 1991 <br /> and wells will be monitored at that time to document th:_i _ oga'Ls< 'c the <br /> remediation. Extraction at an individual probe +r iwe:l .mil be <br /> discontinued when hydrocarbon vapor concentration has bee'i reavc J <<-`ka <br /> vicinity of that probe or well. <br /> Diagrams illustrating the expected shallow and deep zone capture radii <br /> for the site are given in Figures 3 and 4, respectively. In our opinion, <br /> the vapor extraction system design will allow for effective remediation <br /> of the majority of hydrocarbon-affected soils beneath the site. <br /> PROJECT MANAGEMENT AND REVIEW AND REPORT WRITING <br /> j <br /> Project Management will coordinate the syste;n monitoring, review and <br /> submit the results of the monitoring to the regulatory agency to ensure <br /> compliance with regulations, and prepare brief bimonthly reports for <br /> Ultramar Inc. that include the results of the monitoring. <br /> Thank you for the opportunity to propose to install and operate a <br /> remedial system at this site. If you have ary questions, please do not <br /> hesitate to call . <br /> Sincerely, <br /> z <br /> EVAX Technologies, Inc. <br /> S <br /> 1� <br /> Christopher J. Peoples E <br /> Project Ensineer <br /> pbw <br /> E <br /> i <br /> Enclosures: Figure I Proposed Vapor Extraction System y <br /> Figure 2 Beacon Gas Station 0695 Details <br /> Figure 3 Shallow Zone Capture Radii <br /> Figure 4 Deep Zone Capture Radii <br /> cc: Fir. James Maughan, Regional Water Quality Control Board <br /> Mr. Steve Raddigan, Lodi Fire Department <br /> -- ----- -- _- — <br /> 1 - . u-blic.-Health.SrvicesMs Eleanor-Ratliff;-San-Joaquin-P _ ._.__-- <br /> 3 <br /> -— s <br /> -- – <br /> s <br /> c <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.