Laserfiche WebLink
Project A152 21 May 1992 <br /> In response to our recent discussion regarding well locations, please <br /> note the locations of VW-26 and MW--27 on the enclosed site plan <br /> (revised 2-26-92) , and let me know of these are consistent with your <br /> numbering. We will make any necessary revisions. These are designated <br /> as 11VW-26" and "MW-27" on the present report tables. <br /> From 1S July 1991 to 6 May 1992, the system operated 151 days, extracting <br /> approximately 36,760 pounds of hydrocarbons. This is equivalent to <br /> approximately 5,929 gallons of hydrocarbons. <br /> Please feel free to call if you have any questions or comments. <br /> Sincerely, � y%RONA, <br /> EVAX Technologies, Inc. �, p <br /> }n No.03841 <br /> Ups � <br /> Robert A. Nunes <br /> Project Engineer �� <br /> OC CP <br /> Attachments: �Fb4+ <br /> 1) Site Plan (Rev. 2-26-92) <br /> 2) Table I - Extraction Hell/Probe Summary <br /> 3) Table II - Incinerator System and TVH Summary <br /> 4) Table III - Benzene Summary <br /> 5) Laboratory Reports <br /> -3- <br />