My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001856
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
3500 - Local Oversight Program
>
PR0544482
>
ARCHIVED REPORTS XR0001856
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2019 4:54:24 PM
Creation date
5/21/2019 4:32:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001856
RECORD_ID
PR0544482
PE
3528
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
02
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project A152 21 May 1992 <br /> In response to our recent discussion regarding well locations, please <br /> note the locations of VW-26 and MW--27 on the enclosed site plan <br /> (revised 2-26-92) , and let me know of these are consistent with your <br /> numbering. We will make any necessary revisions. These are designated <br /> as 11VW-26" and "MW-27" on the present report tables. <br /> From 1S July 1991 to 6 May 1992, the system operated 151 days, extracting <br /> approximately 36,760 pounds of hydrocarbons. This is equivalent to <br /> approximately 5,929 gallons of hydrocarbons. <br /> Please feel free to call if you have any questions or comments. <br /> Sincerely, � y%RONA, <br /> EVAX Technologies, Inc. �, p <br /> }n No.03841 <br /> Ups � <br /> Robert A. Nunes <br /> Project Engineer �� <br /> OC CP <br /> Attachments: �Fb4+ <br /> 1) Site Plan (Rev. 2-26-92) <br /> 2) Table I - Extraction Hell/Probe Summary <br /> 3) Table II - Incinerator System and TVH Summary <br /> 4) Table III - Benzene Summary <br /> 5) Laboratory Reports <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.