Laserfiche WebLink
APPENDIX-BRISKE BASED CORRECTW ACTION TIER I AND TIER 2 ANALYSIS <br /> SITE CLOSURE EVALUATION REPORT <br /> Former Beacon Station No 695 <br /> 900 South Cherokee Lane <br /> Lodi, California <br /> Delta Project No D093-915 <br /> Page 6 <br /> During the removal of the known tanks, eleven previously unknown tanks were discovered (Figure 3) <br /> Confirmation soil samples were also collected and analyzed from beneath these tanks Analytical results <br /> are presented in Tables 4 and 5 Figures 5 through 8 show the sampling locations and the site features <br /> The final approximate extent of soil excavation, site features, and former tank locations are shown in <br /> Figure 9 <br /> A summary of the available analytical results from the installation of the monitoring wells is presented <br /> m Table 6 These results are from the drilling activities performed by Delta between February and <br /> March 1994 <br /> Figures 10 and 11 show the approximate lateral extent of vadose soil containing petroleum hydrocarbons <br /> quantified as diesel and gasoline prior to remediation Figure 12 presents the traces of cross-sections j <br /> iAW,B-B', and C-C' The cross-sections on Figures 13 through 16 show the approximate vertical extent <br /> of vadose soul containing petroleum hydrocarbons quantified as gasoline and diesel prior to remediation <br /> In March 1996, six confirmation soil borings (SB-1 through SB-6) were installed to assess the affects of <br /> on-site remediation Soil samples collected from the borings were analyzed for total petroleum <br /> hydrocarbons (T H) as gasoline and diesel and BTEX The analytical results are presented in Table 7 <br /> and the remediation confirmation soil boring locations are presented in Figure 2 Utilizing this data, a <br /> risk based assessment was performed on the affects of the remediation performed as of March 1996 This <br /> discussion is presented in Section 5 of this report <br /> 3.2 Distribution of Petroleum Hydrocarbons m Ground Water <br /> Ground water was initially sampled at the site in April 1985, sampling has continued through the second <br /> quarter of 1996 A cumulative presentation of the available ground water sampling data is presented in <br /> Table 8 Free product was reported in monitoring wells MW-8, MW-10 and MW-17, from 1988 to <br /> 1993 The historical product measurement data and the dates measured are presented in Table 1 <br /> RPT001 915 <br />