My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2373
>
2800 - Aboveground Petroleum Storage Program
>
PR0523161
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:41:36 AM
Creation date
5/22/2019 9:35:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523161
PE
2832
FACILITY_ID
FA0009394
FACILITY_NAME
MAXIM CRANE WORKS
STREET_NUMBER
2373
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
2373 E Mariposa Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ruvalcaba, Cesar <br /> From: DPaul <spccorp@hotmaitcom> <br /> Sent: Friday,June 28,2019 10:45 AM <br /> To: Ruvalcaba,Cesar <br /> Subject: SPC Corp Compliance Issues <br /> Cesar: <br /> This memo confirms our telecon in which SPC Corp explained compliance delays for: <br /> 1. Haley Flying Service <br /> 2. Maxim Crane Service <br /> We further advised that neither of these delays were directed by the aforementioned fuel/hazmat end-users <br /> and were the responsibility of SPC Corp. We are submitting proposed corrective-action plans for each site to <br /> commence on 7/15-7/19 in which we/SPC Corp will personally conduct follow-up site inspections at each <br /> facility and advise each client of the steps required to come into compliance with the San Joaquin-CUPA per <br /> your instructions. Thank you for your patience in these matters---we will remain in-touch and will provide <br /> historical as well as current documentation regarding each facility to insure we are presenting facilities in <br /> compliance with your regulatory-directives. <br /> D. Paul McWhorter, CEO <br /> SPC Corporation <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.