My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COMCONEX
>
17333
>
2800 - Aboveground Petroleum Storage Program
>
PR0518597
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 1:51:07 PM
Creation date
5/24/2019 4:35:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0518597
PE
2832
FACILITY_ID
FA0011214
FACILITY_NAME
ATS MANTECA
STREET_NUMBER
17333
Direction
S
STREET_NAME
COMCONEX
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20818018
CURRENT_STATUS
01
SITE_LOCATION
17333 S COMCONEX RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
American Paving Systems, Inc, <br /> PLAN CROSS-REFERENCE (40 CER 112.7) <br /> SPCC <br /> Regulation Description of Requirement Section <br /> 40 CFR <br /> 1.12.1 General Applicability Page 3 <br /> §112.3 Requirements to Prepare and Implement an SPCC Plan <br /> §112.3(d) Professional Engineer Review and Certification Page 5 <br /> §112.3(e) Location of the SPCC Plan Page 5 <br /> §112.4 Amendment of SPCC Plan by Regional Administrator Page 6 <br /> §112.5 Amendment of SPCC Plan by Owner/Operator Page 6 <br /> §112.6 Qualified Facilities Plan Requirements Page 7 <br /> §112.7 General Requirements for SPCC Plans <br /> General Requirements;Discussion of Facility's Conformance <br /> with Part 112 Requirements;Facility Diagrams; Facility _Appendix A <br /> §112.7(a) Description;Discharge Prevention Measures;Discharge and <br /> Drainage Controls;Discharge Countermeasures;Recovered Page 7 - 27 <br /> Material Disposal; Contact Lists and Phone Numbers <br /> §I 12.7(b) Failure Analysis Page 22 <br /> §112.7(c) Secondary Containment and Diversionary Structures Page 23 <br /> §112.7(d) Contingency Planning Page 24 <br /> §I 12.7(e) Inspections,Tests,and Records Page 24 <br /> §112.7(f) Personnel Training and Discharge Prevention Procedures Page 25 <br /> §112.7(g) Security Page 26 <br /> §I 12.7(h) Facility Tank Truck Loading/Unloading Page.27 <br /> §112.7(i) Brittle Fracture Evaluation Page 27 <br /> §112.70) Conformance with State Requirements Page 27 <br /> §112.7(k) Qualified Oil Filled Operation Equipment Page 27 <br /> §112.8 Requirements for Onshore Facilities <br /> §112.8(a) General and Specific Requirements Page 28 <br /> §112.8(b) Facility Drainage Page 28 <br /> §I12.8(c) Bulk Storage Containers Page 28 <br /> §I 12.8(c)(1) Construction page 28 <br /> §112.8(c)(2) Secondary Containment page 28 <br /> §I 12.8(c)(3) Drainage of Diked Areas Page 28 <br /> §I12.8(c)(4) Corrosion Protection Page 28 <br /> §112.8(c)(5) Partially Buried and Bunkered Storage Tanks Page 28 <br /> §112.8(c)(6) Inspections page 29 <br /> §I12.8(c)(7) Heating Coils Page 29 <br /> §112.8(c)(8) Overfill Prevention System Page 29 <br /> §112.8(c)(9) Effluent Treatment Facilities Page 29 <br /> §112.8(c)(10) Visible Discharges Page 29 <br /> §112.8(c)(I 1) Mobile and Portable Containers Page 29 <br /> §112.8(d) Facility Transfer Operations, Pumping, and Facility Process Page 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.