Laserfiche WebLink
American Paving Systems, Inc. <br /> TABLE OF CONTENTS <br /> Subpart A — Applicability, Definitions and General requirements for all <br /> Facilities and all types of Oil Products <br /> Introduction................................ .................................................................... <br /> Engineering Certification 112.2(d).............................................................•............5 <br /> Location of SPCC Plan 112.3(e).............................................................................5 <br /> SPCC Plan Review 11 2.5(a)(b)••............................................................................6 <br /> ManagementApproval.................................... ....................................................6 <br /> 40 CFR 112.7 <br /> Cross References within the SPCC Rule 112.7............................................................7 <br /> Certification of Substantial Harm.Determination 112.7..................................................7 <br /> FacilityInformation 112.7....................................................................................8 <br /> The Facility's Conformance 112.7(x)(1)& (2).............................................................9 <br /> Facility Maps, Drainage &Physical Layout of the Facility.............................................10 <br /> Fuel Delivery Instructions................................................................................... <br /> 1 <br /> Discharge Prevention Measures 112.7(a)(3)(ii)..........................................................13 <br /> Discharge Drainage Control 112.7(a)(3)(iii).............................................................17 <br /> Countermeasures for Discharge Discovery, Response & Cleanup....................................18 <br /> Methods of Disposal of Recovered Materials 112.7(a)(3)(v)..........................................18 <br /> Contact List& Phone Numbers 112.7(a)(3)(vi)..........................................................19 <br /> Information to be Given to Contacts 112.7(a)(4)........................................................20 <br /> Procedures to Follow in the Event of a Discharge 112.7(a)(5)........................................21 <br /> Direction, Rate of Flow& Total Quantity of a Potential Discharge 112.7(b).......................22 <br /> Prevention Systems 112.7(c).....................•......................................................... <br /> 23 <br /> If Measures in 40 CFR 112.7(c) are not Practicable 112.7(d).........................................24 <br /> Inspections, Tests & Records 112.7(e)................................................................... <br /> 24 <br /> Personnel Training for Discharge Prevention Procedures 112.7(f)...................................25 <br /> Security 112.7(g)............................................................................................. <br /> 26 <br /> Tank Truck Loading/Unloading Area Containment 112.7(h)..........................................27 <br /> Field Constructed Tanks 112.7(i).......................................................................... <br /> 27 <br /> Conformance with Local, State& other Regulations & Guidelines 112.70)........................27 <br /> Qualified Oil-Filled Operational Equipment 112.7(k)..................................................27 <br /> Subpart B—Requirements for Petroleum Oils & Non Petroleum Oils 40 CFR 112.8 <br /> General Requirements 112.8(a)..............•.............................................................. <br /> 2 <br /> Facility Drainage 112.8(b)(1) & (2) Diked Areas.......................................................28 <br /> Facility Drainage 112.8(b)(3) & (4)Undiked Areas....................................................28 <br /> j <br /> 2 <br />