Laserfiche WebLink
Table of Contents <br /> INTRODUCTION 4 <br /> PROFESSIONAL ENGINEER(PE) CERTIFICATION- §112.3(d) 5 <br /> MANAGEMENT APPROVAL-§112.7 6 <br /> RECORD OF AMENDMENT AND REVIEWS -§112.5 7 <br /> RECORD OF 5-YEAR PLAN REVIEW 9 <br /> PREFACE- §112.7 10 <br /> 1.0 REGULATORY REQUIREMENTS 11 <br /> 1.1 SPCC Rule Applicability 11 <br /> 2.0 AVAILABILITY OF THE PLAN-§112.3(e) 12 <br /> 3.0 OIL SPILL REPORTING REQUIREMENTS-§110.6 13 <br /> 4.0 GENERAL REQUIREMENTS FOR SPCC PLANS 15 <br /> 4.1 Facility Description-§112.7(a)(3) 15 <br /> 4.2 Tank Schedule-§112.7(a)(3)(i) 15 <br /> 4.3 Procedures-§112.7(a)(3)(ii) 15 <br /> 5.0 DISCHARGE OR DRAINAGE CONTROLS- §112.7(a)(3)(iii) 18 <br /> 5.1.1 Countermeasures-§112.7(a)(3)(iv) 22 <br /> 5.1.2 Disposal-§112.7(a)(3)(v) 22 <br /> 5.1.3 Emergency Contacts-§112.7(a)(3)(vi) 23 <br /> 6.0 SPILL REPORTING- §112.7(a)(4) 24 <br /> In-House Procedures 24 <br /> 7.0 Emergency Response Plan-§112.7(a)(5) 27 <br /> 8.0 SPILL POTENTIAL - §112.7(b) 29 <br /> 9.0 CONTAINMENT AND DIVERSION STRUCTURES - §112.7(c) 30 <br /> 9.1 Onshore facilities - §I12.7(c)(1) 30 <br /> 9.2 Offshore facilities- §112.7 (c)(2) 30 <br /> 10.0 OIL SPILL CONTINGENCY PLAN AND MANPOWER-§112.7(d) 31 <br /> 11.0 INSPECTIONS, TESTS,AND RECORDS-§112.7(e) 32 <br /> 12.0 TRAINING, &DISCHARGE PREVENTION-§112.7(f) 34 <br /> 12.1 Personnel Training-§112.7(f)(1) 34 <br /> 12.2 Emergency Coordinator-§112.7(f)(2) 35 <br /> 13.0 SECURITY-§112.7(g) 36 <br /> 14.0 TANK CAR&TRUCK LOADING/UNLOADING- §112.7(h) 37 <br /> 14.1 Rack Area Drainage-§112.7(H)(1) 37 <br /> TOC-1 <br />