Laserfiche WebLink
14.2 Disconnect Warning-§112.7(h)(2) 37 <br /> 14.3 Examination of Tank Truck Drains-§112.7(h)(3) 37 <br /> 15.0 TANK ALTERATIONS- §112.7(i) 38 <br /> 16.0 STATE OR LOCAL SPILL PREVENTION RULES-§112.70) 39 <br /> 17.0 QUALIFIED OIL-FILLED OPERATIONAL EQUIPMENT-§112.7(k) 40 <br /> 18.0 SPCC REQUIREMENTS FOR ONSHORE FACILITIES-§112.8 41 <br /> 18.1 Facility Drainage-§112.8(b) 41 <br /> 18.1.1 Valves&Pumps on Diked Areas-§1 12(8)(b)(1-2) 41 <br /> 18.1.2 Facility drainage from undiked areas-§112.8(b)(3) 41 <br /> 18.1.3 Drainage diversion system- §112.8(b)(4) 41 <br /> 18.2 Facility Drainage Systems-§112.8(b)(5) 41 <br /> 18.3 Bulk Storage Tanks- §112.8(c) 41 <br /> 18.3.1 Tank Compatibility-§I12.8(c)(1) 41 <br /> 18.3.2 Secondary Containment- §112.8(c)(2) 42 <br /> 18.3.3 Draining Tank Farm Areas- §112.8(c)(3) 42 <br /> 18.3.4 Buried Metallic Storage Tanks-§112.8(c)(4) 42 <br /> 18.3.5 Partially Buried Storage Tanks-§112.8(c)(5) 42 <br /> 18.3.6 Periodic Integrity Testing-§112.8(c)(6) 42 <br /> 18.3.7 Internal Heating Coils-§112.8(c)(7) 42 <br /> 18.3.8 Fail-Safe Engineering-§112.8(c)(8) 43 <br /> 18.3.9 Effluents into Navigable Waters-§112.8(c)(9) 43 <br /> 18.3.10 Correction of Tank Deficiencies- §112.8(c)(10) 43 <br /> 18.3.11 Mobile/Portable Oil Storage Tank- §112.8(c)(11) 43 <br /> 18.4 Transfer Operations&In-Facility Process-§112.8(d) 43 <br /> 18.4.1 Buried Piping Installations-§112.8(d)(1) 43 <br /> 18.4.2 Out of Service Piping-§112.8(d)(2) 44 <br /> 18.4.3 Piping Support Design-§112.8(d)(3) 44 <br /> 18.4.4 Inspection of Valves and Piping-§112.8(d)(4) 44 <br /> 18.4.5 Aboveground Piping-§112.8(d)(5) 44 <br /> 19.0 Oil Production Facility Drainage-§112.9 45 <br /> 20.0 Oil Drilling and Workover Facilities-§112.10 45 <br /> 21.0 Offshore Oil Drilling,Production,Workover Facilities-§112.11 45 <br /> 22.0 Animal Fats and Oils-Subpart C, §112.12-§112.15 45 <br /> TOC-2 <br />