Laserfiche WebLink
1 <br /> November 2001 Quarterly Ground Water Monitoring <br /> 1645 Cherokee Lane,Stockton,CA <br />' Hydro-Environmental Technologies,Inc <br />' Table 1: Ground Water Table Measurements <br /> Central California Traction Company,Stockton CA <br />' Monitoring Top of Monitoring Depth to GW Table Temp pH Conductivity <br /> Well No Casing Date GW Elevation (°F) (units) (gslcm) <br /> Elevation (ft) (ft AMSL) <br /> (ft AMSL) <br /> MW-1 1794 9/1/2000 4620 -2826 691 528 1865 <br /> 5/1/2001 4361 -2567 676 5 15 1195 <br />' 7/23/2001 4872 -3078 733 611 1308 <br /> 11/15/2001 NA NA NA NA NA <br /> MW-2 1835 9/1/2000 4660 -2825 687 52 181 <br />' 5/1/2001 4400 -2565 686 615 1166 <br /> 7/23/2001 4898 -3063 NA NA NA <br /> 11/15/2001 NA NA NA NA NA <br />' MW-3 1865 9/1/2000 4681 -2816 698 501 202 <br /> 5/1/2001 4429 -2564 669 501 1140 <br /> 7/23/2001 4892 -3027 NA NA NA <br /> 11/15/2001 NA NA NA NA NA <br /> MW-4 1796 11/15/2001 NA NA NA NA NA <br /> Notes <br />' NA Not available since the wells were dry <br /> 2 21 Ground Water Table Measurements <br /> Based on the current monitoring well installation investigation, ground water in the unconfined to serm- <br /> confined zone ranged from approximately —30 78 feet above mean sea level (AMSL) to —30 27 feet <br /> AMSL Ground water flow was not determined this quarter since all of the wells were dry <br /> 3 <br />