My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
2711
>
2900 - Site Mitigation Program
>
PR0528900
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 11:47:48 AM
Creation date
5/28/2019 11:46:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528900
PE
2950
FACILITY_ID
FA0019364
FACILITY_NAME
SOUTH RIVER RANCH LLC
STREET_NUMBER
2711
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05813011
CURRENT_STATUS
01
SITE_LOCATION
2711 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reynolds Ranch APNs 050-10&-11 • Page 3 <br /> Our Project Number: LES 78 <br /> November 5, 2008 <br /> 4.2 Quality Assurance/Quality Control (QA/QC) Procedures <br /> Quality Assurance/Quality Control (QA/QC) procedures will be used to minimize the potential for <br /> contamination of soil samples. The QA/QC procedures may include the use of single-use <br /> sampling equipment, decontamination of drilling and sampling equipment by washing with a <br /> solution of potable water and Liquid-Nox solution or equivalent between borings, use of one <br /> duplicate sample per day, changing latex protective gloves after each sample, and recording <br /> sample information on chain-of-custody forms. <br /> 4.3 Soil Sample Laboratory Tests <br /> Soil samples will be transported to a California state certified analytical laboratory where the <br /> following Environmental Protection Agency (EPA) tests will be performed: total petroleum <br /> hydrocarbons as gasoline (TPH-g), oxygenates, benzene, toluene, ethyl benzene, and xylenes <br /> (BTEX) by 8015M/8260B, total extractable petroleum hydrocarbons as diesel (TPH-d) and motor <br /> oil (TPH-m.o.) by 8015M/8021B, and LUFT 5 Metals by 7000 series. <br /> 5.0 PROPOSED TIME SCHEDULE FOR WORK <br /> Assuming approval of this work-plan, we propose to perform the work between November 6 <br /> and November 12, 2008. Standard laboratory turn-around is five business days. We will <br /> forward the results of the work to the EHD within one week of receipt of the laboratory results. <br /> 6.0 REPORT PREPARATION <br /> A letter report will be prepared to present the analytical test results for the soil samples. The <br /> letter report will include laboratory test result sheets and chain-of-custody documentation. <br /> 7.0 LIMITATIONS <br /> The proposed scope of work for the soil borings has been tailored to address the specific issue <br /> of the former underground storage tank on the property. If additional investigation is <br /> requested, such investigation will be performed as a separate scope of work. <br /> 8.0 SIGNATURES OF ENVIRONMENTAL PROFESSIONALS <br /> This workplan has been prepared under the supervision and direction of the undersignAoFEs '/o <br /> ,y <br /> . <br /> mac <br /> NEIL O, ANDERSON&ASS 7E 4 �Q�i S. H. <br /> I•'`Q�2 P'LRy�Q^J 9 <br /> Q <br /> w No.2586 q m <br /> RGA t-08321 * rL EXP.6/09 a <br /> REA I Abigail08321 Project Scie "'"' ��� GarPE 5 10, G 2588 Principal s4. OFCAUF� P/ <br /> NOV 0 62008 <br /> 902 Industrial Way•Lodi,CA 95240-209.367.3701 •Fax 209.369.4228 ®2007Net10.Anderson&Associates,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.