My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS 2002 - 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
3535
>
3500 - Local Oversight Program
>
PR0544497
>
WORK PLANS 2002 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:46:35 PM
Creation date
5/28/2019 2:36:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
2002 - 2013
RECORD_ID
PR0544497
PE
3528
FACILITY_ID
FA0003687
FACILITY_NAME
OLD TRUCK STOP, THE
STREET_NUMBER
3535
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
13206009
CURRENT_STATUS
02
SITE_LOCATION
3535 CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Remediation Work Plan <br /> CHEROKEE TRUCK STOP <br /> 3535 East Cherokee Road, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION. . <br /> 2.0. SCOPE OF WORK. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 2.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES.. . . . . . . . . . . . . . . 2 <br /> 2.2. WELL INSTALLATION AND SURVEY. . . . . .. . . . . . . . . <br /> 2 <br /> 2.3. HIGH VACUUM SOIL VAPOR EXTRACTION REMEDIATION. . . . . . . . 4 <br /> 2.4. REPORT PREPARATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 3.0. FIELD PROCEDURES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 3.1. DRILLING AND SOIL SAMPLING. . . . . . . . . : . . . . . . . . . . . . . . . . . . . . 5 <br /> 3.2. WELL COMPLETION AND SURVEY. . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 3.3. SVE SYSTEM DESIGN AND IMPLEMENTATION. . . . . . . . . . . . . . . . . . 6 <br /> 3.4 HVSVE OPERATION. . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 3.4.1 Field Measurements. . . . . . . . . . . . . 7 <br /> 3.4.2 Collection and Analysis of Vapor. . . . . . . . . . . . . . . . . . . . 7 <br /> 3.5. EQUIPMENT DECONTAMINATION.. . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> I <br /> FIGURES <br /> Figure 1 - Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Geological Cross-Section B-B' <br /> Figure 4 - Maximum Detections of TPH-g in Soil Samples <br /> Figure 5 -Proposed Shallow SVE Well Construction Details <br /> Figure 6 - Proposed Deep SVE Well Construction Details <br /> i <br /> APPENDICES <br /> Appendix A - Site.Background <br /> i <br /> Advanced Geo Environmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.