San Joaquin Local Health District Re: Site/Soi' Re-Excavation Work Plan <br /> March 16, 1989 - Page 2 of 2 3437 Newton Road, Stockton, CA <br /> AApril 20� 1989 Revised___ __ _ <br /> 5. Re-Excavation Steps: At this time we are requesting a resample. Our plan <br /> is to excavate an area approximately 22 feet wide by 41 feet long. Starting <br /> at the north edge of the 2,000 gallon tank excavation and continuing south by <br /> southeast approximately 41 feet toward the northwest corner of the existing <br /> building. Excavate to a depth of 35 to 40 feet. Stockpile the excavated <br /> soil on site on plastic and cover with same, hopefully to remove all contam- <br /> inated soil from, in, and around the excavated area. See drawing "D" for <br /> proposed excavation area and placement of newly excavated soil along with <br /> ramp and ramp soil placement. Drawing "E" shows the side view of the ramp. <br /> i From the bottom of the ramp we will use the excavator to dig to the bottom <br /> of the proposed excavation. Should it be necessary to undermine the northwest <br /> corner of the existing building to retrieve contaminated soil, the building <br /> { will be shored up to prevent its collapse. <br /> There will be approximately 970 to 1,135 cubic yards of soil excavated, <br /> depending on depth of excavation. See drawing "F" for planned excavation to <br /> 35 feet deep and 40 feet deep. We will be prepared to take as many samples <br /> as the SJLHO deems necessary. Weplan to take bottom samples from the exca- <br /> vated area as shown on drawing "D", which also shows proposed sampling locations <br /> of the previously removed stockpiled soil and the proposed newly excavated soil <br /> stockpile area. Newly excavated soil will be sampled at the rate of 2 samples <br /> for every 50 cubic yards. We will test the soil as shown on the attached copy <br /> r of Minimum Verification Lab Analyses (highlighted areas). <br /> Drawing "G" is a side view illustration showing the extent of the torrent <br /> excavation and proposed additional excavation, Drawing"H" shows proposed side- <br /> wall sample locations. Drawing "I" shows the location of the domestic well. <br /> c Upon researching, the well depth is at 196 feet.. Also shownon Drawing"I" is <br /> the septic tank. and leach lines. <br /> Hopefully the sample result levels are low enough to allow aeration of <br /> the excavated soil on site under permits, guidelines, and direction of the <br /> San Joaquin County Air Pollution Department. <br /> If the level of contaminates show too high for aeration, the soil will <br /> be transported to a proper hazardous waste facility for disposal, namely <br /> Kettleman City, or possibly a Class 2 site, such as Forward, Inc. If the <br /> soil is removed from the site, it shall be transported under proper licensure. <br /> Any manifests produced during transfer shall have a copy provided to SJLHD <br /> within 30 days. <br /> 6. Timing; Sampling could be scheduled within one week following your review of <br /> this work plan.. Advance inspection notice of at least 48 hours will be given <br /> to SJLHD for resampling inspection. The sample analysis should be ready for <br /> your review within three weeks after they have been taken. <br /> APRKWCES <br />