My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
1126
>
2800 - Aboveground Petroleum Storage Program
>
PR0527768
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 2:32:27 PM
Creation date
5/28/2019 4:37:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527768
PE
2832
FACILITY_ID
FA0003771
FACILITY_NAME
E F KLUDT & SONS INC
STREET_NUMBER
1126
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906022
CURRENT_STATUS
01
SITE_LOCATION
1126 E PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA NA MU I N Environmental Health Department <br /> COUNTY— <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Fecn im Address: Data: <br /> E F KLUDT&SONS INC 1126 E PINE ST, LODI May 09,2019 <br /> Other Violations <br /> 4030 See below Unlisted OperationvMaintenance violation o V o R o COS <br /> 4040 See below Unlisted ReleasvLeaksl5pills violation oV oR oCOS <br /> 4050 See below Unlisted AbandonmenVlllegal Disposal/Unauthorized Treatment violation oV oR oCOS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Nmica to Comply) <br /> Item M Remarks <br /> 603 CFR 112.7(ax3)Failed to adequately describe the physical layout of the facility in the Plan. <br /> The facility diagram does not mark as'exempt"underground storage tanks located at the facility.The facility diagram <br /> does not included transfer stations or connecting pipes,specifically the underground pipes associated with the <br /> aboveground storage tanks. <br /> Describe in your Plan the physical layout of the facility and include a facility diagram,which must mark the location and <br /> contents of each fixed oil storage container and the storage area where mobile or portable containers are located.The <br /> facility diagram must identify the location of and mark as'exempt'underground tanks that are otherwise exempted from <br /> the requirements of this part under§112.1ftl The facility diagram must also include all transfer stations and <br /> connecting pipes,including intra-facility gathering lines that are otherwise exempted from the requirements of this part <br /> under§112.1(d)(11). <br /> The SPCC plan should include all the required components in the facility diagram. Submit facility diagram for review. <br /> This is a Class II violation. <br /> 626 CFR 112.7(hx1)Loading/unloading rack containment system not adequate to contain spill. <br /> The SPCC plan does not address the secondary containment system for the loading rack.Three movable piping <br /> assemblies with at least one swivel joint were observed and meet the definition Cie loading rack.A containment system <br /> capable of holding at least the maximum capacity of any single compartment of a tank truck loaded at the facility was not <br /> evident and was not addressed in the SPCC plan.The oil/water separator capacity is not discussed and the largest <br /> container on the truck is not discussed.A drain for the oil water separator was not observed in the immediate vicinity of <br /> the loading rack. <br /> (1)Where loading/unloading rack drainage does not flow into a catchment basin or treatment facility designed to handle <br /> discharges,use a quick drainage system for tank car or tank truck loading/unloading racks.You must design any <br /> containment system to hold at least the maximum capacity of any single compartment of a tank car or tank truck loaded <br /> or unloaded at the facility. <br /> (2)Provide an interlocked warning light or physical barrier system,warning signs,wheel chocks or vehicle brake <br /> interlock system in the area adjacent to a loading/unloading rack,to prevent vehicles from departing before complete <br /> disconnection of flexible or fixed oil transfer lines. <br /> (3)Prior to filling and departure of any tank car or tank truck,closely inspect for discharges the lowermost drain and all <br /> outlets of such vehicles,and if necessary,ensure that they are tightened,adjusted,or replaced to prevent liquid <br /> discharge while in transit. <br /> The SPCC plan should adress secondary containment in all loading rack truck loading and unloading areas.Submit a <br /> Professional Engineer Certified SPCC plan for review. <br /> This is a Class II violation. <br /> FMW3771 PR0=69 SC001 059&2019 <br /> EHD2SU1 Rcr.0.l9/A1S Fage4of] Abaveg JPtlrtlam Stemal AC OIR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjoehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.