Laserfiche WebLink
SA NA MU I N Environmental Health Department <br /> COUNTY— <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: IF cin <br /> iry Address: Date: <br /> E F KLUDT&SONS INC 1126 E PINE ST, LODI May 09,2019 <br /> SUMMARY OF VIOLATIONS <br /> ICLASS I,CLASS II,or MINOR-Noticeto Comply) <br /> Item M Remarks <br /> 705 CFR 112.8(cx1)Container not compatible with oil stored and/or storage conditions. <br /> The SPCC plan certifies the tanks material and construction for 4 tanks within the diked area and 3 tanks outside the <br /> diked are.There were also 55 gallon drums and 275 gallon totes being used as containers for the storage of oil and the <br /> material and construction are not certified. <br /> Not use a container for the storage of oil unless its material and construction are compatible with the material stored <br /> and conditions of storage such as pressure and temperature. <br /> The SPCC should certify material and construction for all containers regulated under APSA storing APSA regulated <br /> product <br /> This is a Class II violation. <br /> 706 CFR 112.8(cx2)Failed to provide and maintain adequate secondary containment. <br /> Some of the single walled tanks in the diked secondary containment area appear to be permanently manifolded.This is <br /> not discussed in the SPCC plan and the secondary containment for the combined tanks is not addressed in the SPCC <br /> plan. <br /> Construct all bulk storage tank installations(except mobile refuelers and other non-transportation-related tank trucks) <br /> so that you provide a secondary means of containment for the entire capacity of the largest single container and <br /> sufficient freeboard to contain precipitation.You must ensure that diked areas are sufficiently impervious to contain <br /> discharged oil.Dikes,containment curbs,and pits are commonly employed for this purpose.You may also use an <br /> alternative system consisting of a drainage trench enclosure that must be arranged so that any discharge will terminate <br /> and be safely confined in a facility catchment basin or holding pond. <br /> The SPCC plan should address secondary containment for the entire capacity for the single largest container and <br /> sufficient freeboard to contain precipitation. Submit Professional Engineer Plan for review. <br /> Note: Permanently manifolded tanks are tanks that are designed, installed,or operated in such a manner that the <br /> multiple containers function as a single storage unit(67 FR 47122,July 17, 2002).Accordingly,the total capacity of <br /> manifolded containers is the design capacity standard for the sized secondary containment provisions(plus freeboard <br /> in certain cases). <br /> The EPA believes the proper standard of'sufficient freeboard'to contain precipitation is that amount necessary to <br /> contain precipitation from a 25-year,24-hour storm event.That standard allows flexibility for varying climatic conditions. <br /> It is also the standard required for certain tank systems storing or treating hazardous waste.(67 FR 47117, July 17, <br /> 2002) <br /> This is a Class II violation. <br /> FMW3771 PR0=69 SN01 059&2019 <br /> EHD28U1 Rcr.0.12FC0I8 Page5of7 Abaveg J Pertlam Sbra)e AC OIR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehdCom <br />