April 26, 1988 AGS Job No. 2005-P <br /> Delta Truck Sales, Stockton, California <br /> excavation could be backfilled approximately four to eight weeks <br /> after the initial excavation. <br /> Immediately after backfilling, the ground-water monitoring well <br /> will be installed, developed, and sampled. Results of ground- <br /> water analyses should be available approximately 17 days after <br /> initiation of drilling operations or approximately six to seven <br /> weeks after commencement of field work. <br /> After initial assessment of the character of contamination in the <br /> soil piles, clean material will be returned to the excavation <br /> during backfilling operations. A decision as to the most <br /> appropriate disposal alternative for contaminated soil will be <br /> made approximately 4 weeks after excavation begins. Class I, II, <br /> or III disposal could be implemented immediately thereafter, if <br /> found to be appropriate. Treatment of the soil, if selected as <br /> an alternative, will proceed as soon as possible after approval <br /> and appropriate permits, if any, are acquired from the <br /> appropriate state and local regulatory agencies. <br /> 18 <br /> A,vviied GeOSvstems <br />