Laserfiche WebLink
April 26, 1988 <br /> Delta Truck Sales, Stockton, California AGS Job No. 2005-p <br /> A field blank will be collected using the same sampling utensils <br /> as the ground water samples. The blank sample will be analyzed <br /> only if analysis of the groundwater sample indicates <br /> contamination. The groundwater sample will be analyzed for TPH <br /> (8015-fused capillary column) , oil and grease, purgeable organics <br /> (EPA 624) , metals, and major ions (refer to discussion of soils <br /> analyses for specific compounds to be analyzed) . <br /> A copy of Applied Geosystem's standard operating procedures II' <br /> associated with well construction, well development ° <br /> water samplin . and ground- <br /> g is included in Appendix II of this report. <br /> Schedule of 0 <br /> erations <br /> lit <br /> ' I <br /> Initial field activities; including excavation and collection of <br /> soil samples, will proceed as soon as logistically possible after <br /> approval of the proposed procedures by the CRWQCB. The <br /> scheduling <br /> of initial work will be the responsibility of Kip <br /> Prahl Associates. Analytical results of soil samples generated <br /> during this initial � <br /> Phase should be available approximately <br /> 15 to <br /> ! <br /> 20 days after sample collection. At that time, pa decision can be <br /> made as to whether the excavation should be enlarged to <br /> unacceptabl g remove <br /> y contaminated material. We would expect that the <br /> 17 <br /> �i. <br />