Laserfiche WebLink
1 .5 Soil Sampling - DI-WET <br /> Two samples will be submitted for deionized water Waste Extraction Test (DI-WET) <br /> analyses in support of the RI/FS Water Quality Site Assessment. These samples will be <br /> collected adjacent to the location of the sample previously scheduled for DI-WET at SWMU <br /> 1/Area 2; the original sample had insufficient volume remaining and thus replacement <br /> samples are needed. At SWMU 27, the selection of a sample for DI-WET analysis will be <br /> based on the Phase III sample(s) with the highest concentrations of metals and OC <br /> pesticides. <br /> 2.0 PHASE III FIELD SAMPLING PLAN <br /> A description of the specific field methods to be used is provided in the Final Phase II <br /> Sampling Plan (December 1994). The following field sampling techniques will be used <br /> during the Phase III investigation; the specific section of the Work Plan is provided for <br /> reference: <br /> -Subsurface soil sampling using hollow-stem auger drilling (A.3.6). <br /> -Borehole abandonment (A.3.9). <br /> -Sludge sampling (A.3.7). <br /> -Sediment sampling(A.6.2). <br /> -Groundwater sampling from existing monitoring wells (A.5.7). <br /> -Surveying of soil boring locations (A.7.0). <br /> -Decontamination (A.10.0). <br /> -Field equipment calibration (A.11.0). <br /> -Sample handling and shipment(A.12.0). <br /> -Documentation (A.13.0). <br /> Investigation-derived wastp (IDW) will be handled according to the procedures described in <br /> Section A.14.0 of the Phase II Work Plan, with the following modifications. A single bin <br /> will be used for the containment of all soils generated during the Phase III effort. IDW soil <br /> samples will be collected according to the Phase II Work Plan; the samples will be analyzed <br /> for the following parameters: <br /> -Halogenated VOCs by USEPA Method 8010. <br /> •SVOCs by USEPA Method 8270. <br /> -OC Pesticides by USEPA Method 8080. <br /> • Chlorinated Herbicides by USEPA Method 8150. <br /> •TPH quantified as gas, diesel, and motor oil by modified USEPA Method 8015. <br /> .Metals by USEPA Methods 6010 and 7000 series. <br /> •DI-WET analyses for any pesticides or metals exceeding 10 times the <br /> corresponding STLC. <br /> •TCLP analyses (metals, OC pesticides, VOCs, SVOCs, and chlorinated <br /> herbicides) for any compound exceeding 20 times the TCLP limit. <br /> IDW water samples will not be collected, as the same locations have been previously <br /> sampled and the resulting liquid IDW has met acceptable limits for discharge to the lined <br /> Industrial Waste Ponds. <br /> 3.0 PHASE III QUALITY ASSURANCE PROJECT PLAN <br /> Sampling and analytical procedures will be performed in accordance with Appendix B of <br /> the Phase II Work Plan. Modifications to the plan are discussed below. <br /> 3 <br />