Laserfiche WebLink
• DDJC-Tracy GMS Boundarondition Verification Work Plan , <br /> • Field Equipment Use and Calibration through planning and preparation prior to <br /> (Section 9.2); beginning the field investigation. <br /> • Data Management(Section 11.0); and 3.3.2 The main DDJC-Tracy point-of-contact <br /> (POC),to this program is Marshall Cloud <br /> • Health and Safety(Section 12.0). As (209)982-2086. Other personnel may be identi- <br /> required by the Comprehensive Field fied prior to or in the early stages of the planned <br /> Work Plan, a site-specific Health and field investigation. <br /> Safety Plan is provided in Appendix A. <br /> 3.3.3 Radian will immediately report via <br /> 3.2 Site Reconnaissance, telephone to the DDJC-Tracy POC, or the <br /> Preparation, and Restoration designate, any data or results generated during <br /> this investigation that may indicate an imminent <br /> 3.2.1 Emergency equipment(e.g., fire health risk. Following this telephone notifica- <br /> extinguishers,personnel safety equipment, etc.) tion, a written notice will be prepared and <br /> will be kept at each site where work is being delivered within three days. This special <br /> conducted. Each work crew will be equipped notification shall include supporting <br /> with a mobile phone to communicate with the documentation. <br /> DDJC-Tracy staff or local authorities in order to <br /> quickly alert the appropriate emergency service 4.0 DATA ASSESSMENT AND <br /> should their assistance be required. REPORTING <br /> 3.2.2 The objective of the site restoration is to Data Assessment and reporting will be <br /> leave the area of work as it was originally. performed in accordance with the final <br /> Unused boring materials, stakes, and flagging Comprehensive Field Work Plan(Radian, <br /> will be removed from each site at the conclusion 1998). <br /> of work.No increases in erosion potential are <br /> anticipated as a result of this work. Site 4.1 Data Evaluation <br /> restoration requires close coordination with the <br /> City of Tracy and San Joaquin County to ensure 4.1.1 The data collected or compiled during the <br /> that site cleanup is in accordance with local subsurface investigations generally will include: <br /> requirements. <br /> • Northing and easting coordinates; <br /> 3.2.3 Placement of all proposed CPT/geoprobe <br /> boring locations will be verified with the Utility • Surface elevations; and <br /> Service Alert(USA) in order to avoid any <br /> underground obstacles(e.g., utilities or other • Groundwater elevations <br /> suspected buried hazards). Each CPT location <br /> will be marked with white paint prior to 4.1.2 The data assessment effort includes the <br /> contacting USA for utility clearance. evaluation and screening of field data for <br /> acceptable accuracy and precision. All data will <br /> 3.3 Site Management be reduced and tabulated in a systematic manner <br /> to facilitate data review. The data reduction may <br /> 3.3.1 The goal of site management is to include computer analysis, graphic <br /> conduct all field operations in an appropriate representation, or other methods that will <br /> and efficient manner while minimizing impacts facilitate analysis of data and conceptualization <br /> to roadway traffic. This goal will be met by of results. The data evaluation procedures will <br /> quickly establishing effective communication utilize the DDJC-Tracy Environmental Data <br /> between the contractor and local authorities, and Management System (EDMS). The EDMS <br /> t-gms-wp 7 30 April 1999 <br />